ANALISIS DISTRIBUSI FRAGMENTASI PELEDAKAN AIR DECK DAN NON AIR DECK TERHADAP PRODUKTIVITAS POWER SHOVEL KOMATSU PC 3000 DI PIT 2 BANKO BARAT PT BUKIT ASAM, Tbk, TANJUNG ENIM, SUMATERA SELATAN

NUGRAHA, M. DIDA GALIH and Toha, M. Taufik and Ningsih, RR. Yunita Bayu (2020) ANALISIS DISTRIBUSI FRAGMENTASI PELEDAKAN AIR DECK DAN NON AIR DECK TERHADAP PRODUKTIVITAS POWER SHOVEL KOMATSU PC 3000 DI PIT 2 BANKO BARAT PT BUKIT ASAM, Tbk, TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381520048.pdf] Text
RAMA_31201_03021381520048.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021381520048_TURNITIN.pdf] Text
RAMA_31201_03021381520048_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (18MB) | Request a copy
[thumbnail of RAMA_31201_03021381520048_8864000016_0023037813_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021381520048_8864000016_0023037813_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (709kB) | Preview
[thumbnail of RAMA_31201_03021381520048_8864000016_0023037813_02.pdf] Text
RAMA_31201_03021381520048_8864000016_0023037813_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (947kB) | Request a copy
[thumbnail of RAMA_31201_03021381520048_8864000016_0023037813_03.pdf] Text
RAMA_31201_03021381520048_8864000016_0023037813_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (384kB) | Request a copy
[thumbnail of RAMA_31201_03021381520048_8864000016_0023037813_04.pdf] Text
RAMA_31201_03021381520048_8864000016_0023037813_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (868kB) | Request a copy
[thumbnail of RAMA_31201_03021381520048_8864000016_0023037813_05.pdf] Text
RAMA_31201_03021381520048_8864000016_0023037813_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (193kB) | Request a copy
[thumbnail of RAMA_31201_03021381520048_8864000016_0023037813_06_ref.pdf] Text
RAMA_31201_03021381520048_8864000016_0023037813_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (120kB) | Request a copy
[thumbnail of RAMA_31201_03021381520048_8864000016_0023037813_07_lamp.pdf] Text
RAMA_31201_03021381520048_8864000016_0023037813_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy

Abstract

Kegiatan penambangan batubara PT Bukit Asam, Tbk memiliki salah satu kegiatan pengupasan tanah penutup (overburden). Kegiatan penambangan di Pit 2 Banko Barat belum efisien dikarenakan terdapatnya boulders hasil peledakan yang mengakibatkan alat gali muat PC 3000 tidak optimal sehingga diperlukan peledakan menggunakan air deck dan non-air deck. Tujuan penelitian ini mengetahui geometri peledakan, penggunaan handak, powder factor¸fragmentasi hasil peledakan, pengaruh geometri peledakan terhadap fragmentasi hasil peledakan air deck dan non-air deck, dan pengaruh fragmentasi terhadap produktivitas PC 3000. Geometri peledakan air deck di Pit 2 yaitu burden 6,90 meter, spasi 7,21 meter, kedalaman lubang 6,78 meter, kolom isian 2,13 meter, stemming 3,65 meter, jumlah ANFO 2629,06 kg, dan powder factor 0,15 kg/BCM, sedangkan non-air deck yaitu burden 6,92 meter, spasi 7,92 meter, kedalaman lubang 6,38 meter, kolom isian 1,86 meter, stemming 4,3 meter, jumlah ANFO 2055,45 kg, dan powder factor 0,13 kg/BCM. Hasil fragmentasi peledakan diolah menggunakan Split Desktop, didapatkan rata-rata boulders (fragmentasi >100 cm) 2,32% sedangkan non-air deck didapatkan rata-rata boulders (fragmentasi >100 cm) 3,54% dapat dikatakan fragmentasi air deck cukup baik. Rata-rata cycle time PC 3000 menggunakan air deck 35,81 detik sedangkan non-air deck 39,21 detik. Produktivitas PC 3000 air deck 888,91 BCM/jam sedangkan non-air deck 811,82 BCM/jam.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Peledakan, Fragmentasi, Produktivitas, Alat gali muat
Subjects: T Technology > TN Mining engineering. Metallurgy > TN799.5-948 Nonmetallic minerals
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 6702 not found.
Date Deposited: 28 Jul 2020 05:04
Last Modified: 28 Jul 2020 05:04
URI: http://repository.unsri.ac.id/id/eprint/31850

Actions (login required)

View Item View Item