YOLANDA, TENGKU REZKU and HARUN, M and Melwita, Elda (2020) PRA RANCANGAN PABRIK PEMBUATAN LITIUM KARBONAT KAPASITAS 44.000 TON/TAHUN. Undergraduate thesis, Sriwijaya University.
Text
RAMA_24201_03031181621024_03031281621110.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
|
Text
RAMA_24201_03031181621024_03031281621110_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (9MB) | Request a copy |
|
Preview |
Text
RAMA_24201_03031181621024_03031281621110_0011057504_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (811kB) | Preview |
Text
RAMA_24201_03031181621024_03031281621110_0011057504_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (187kB) | Request a copy |
|
Text
RAMA_24201_03031181621024_03031281621110_0011057504_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (268kB) | Request a copy |
|
Text
RAMA_24201_03031181621024_03031281621110_0011057504_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (221kB) | Request a copy |
|
Text
RAMA_24201_03031181621024_03031281621110_0011057504_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (215kB) | Request a copy |
|
Text
RAMA_24201_03031181621024_03031281621110_0011057504_06.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (514kB) | Request a copy |
|
Text
RAMA_24201_03031181621024_03031281621110_0011057504_07.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (275kB) | Request a copy |
|
Text
RAMA_24201_03031181621024_03031281621110_0011057504_08.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (224kB) | Request a copy |
|
Text
RAMA_24201_03031181621024_03031281621110_0011057504_09.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (32kB) | Request a copy |
|
Text
RAMA_24201_03031181621024_03031281621110_0011057504_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (150kB) | Request a copy |
|
Text
RAMA_24201_03031181621024_03031281621110_0011057504_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (3MB) | Request a copy |
Abstract
Pabrik pembuatan litium karbonat dengan kapasitas produksi 44.000 ton/tahun ini direncanakan berdiri pada tahun 2025 di Kabupaten Tangerang, Provinsi Banten yang diperkirakan memiliki luas area sebesar 6 Ha. Bahan baku dari pembuatan litium karbonat ini adalah litium klorida, air, dan karbon dioksida. Proses pembuatan litium karbonat ini mengacu pada US Patent No. 2015/9,034,295 B2. Reaktor pertama berjenis reaktor sel elektrokimia dan reaktor kedua adalah reaktor jenis continuous stirred tank reactor. Reaktor pertama beroperasi pada temperatur 90oC dan tekanan 1 atm sedangkan reaktor kedua beroperasi pada temperatur 95oC dan tekanan 18,73 atm. Bentuk perusahaan yang akan digunakan pada pabrik ini adalah Perseroan Terbatas (PT) dengan sistem organisasi Line dan Staff, dipimpin oleh seorang Direktur dengan total karyawan 108 orang. Berdasarkan hasil analisa ekonomi, pabrik litium karbonat ini layak untuk didirikan karena telah memenuhi berbagai macam persyaratan parameter ekonomi, yaitu sebagai berikut: • Total Capital Investment (TCI) = US $ 136.277.319 • Total Penjualan = US $ 540.696.595 • Total Production Cost (TPC) = US $ 418.957.735 • Annual Cash Flow = US $ 65.221.284 • Pay Out Time = 2,02 Tahun • Rate Of Return On Investment (ROR) = 40,13% • Break Even Point (BEP) = 39,25% • Service Life = 11 Tahun
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Pra Rancangan Pabrik, Litium Karbonat |
Subjects: | T Technology > TP Chemical technology > TP155-156 Chemical engineering |
Divisions: | 03-Faculty of Engineering > 24201-Chemical Engineering (S1) |
Depositing User: | Users 7367 not found. |
Date Deposited: | 27 Aug 2020 02:35 |
Last Modified: | 27 Aug 2020 02:35 |
URI: | http://repository.unsri.ac.id/id/eprint/33064 |
Actions (login required)
View Item |