EVALUASI KINERJA ALAT ANGKUT BELT CONVEYOR DALAM UPAYA PENCAPAIAN TARGET PRODUKSI SEBESAR 90.000 TON/BULAN PADA UNIT PLANT A PENAMBANGAN BATUAN ANDESIT DI PT. SUMBER GUNUNG MAJU, BRAVO 9, KABUPATEN SERANG, PROVINSI BANTEN

APRILYANDI, HANDI and Amin, Muhammad and Abuamat HAK, Abuamat HAK (2020) EVALUASI KINERJA ALAT ANGKUT BELT CONVEYOR DALAM UPAYA PENCAPAIAN TARGET PRODUKSI SEBESAR 90.000 TON/BULAN PADA UNIT PLANT A PENAMBANGAN BATUAN ANDESIT DI PT. SUMBER GUNUNG MAJU, BRAVO 9, KABUPATEN SERANG, PROVINSI BANTEN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181621121.pdf] Text
RAMA_31201_03021181621121.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_0302118161121_TURNITIN.pdf] Text
RAMA_31201_0302118161121_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (18MB) | Request a copy
[thumbnail of RAMA_31201_03021281621121_0018085815_0013124801_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281621121_0018085815_0013124801_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (780kB) | Preview
[thumbnail of RAMA_31201_03021281621121_0018085815_0013124801_03.pdf] Text
RAMA_31201_03021281621121_0018085815_0013124801_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (318kB) | Request a copy
[thumbnail of RAMA_31201_03021281621121_0018085815_0013124801_02.pdf] Text
RAMA_31201_03021281621121_0018085815_0013124801_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021281621121_0018085815_0013124801_05.pdf] Text
RAMA_31201_03021281621121_0018085815_0013124801_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (91kB) | Request a copy
[thumbnail of RAMA_31201_03021281621121_0018085815_0013124801_04.pdf] Text
RAMA_31201_03021281621121_0018085815_0013124801_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (816kB) | Request a copy
[thumbnail of RAMA_31201_03021281621121_0018085815_0013124801_06_ref.pdf] Text
RAMA_31201_03021281621121_0018085815_0013124801_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (152kB) | Request a copy
[thumbnail of RAMA_31201_03021281621121_0018085815_0013124801_07_lamp.pdf] Text
RAMA_31201_03021281621121_0018085815_0013124801_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT Sumber Gunung Maju is a company engaged in the mining industry andesite stone. PT Sumber Gunung Maju carries out the andesite stone processing by operating the crushing unit plant with a production target of 90,000 tons / month. The average conveyor belt capacity is 78.6 TPH for splits 2/3, 157.2 TPH for split 1/2, and for rock ash as much as 109.2 TPH. PT Sumber Gunung Maju owns a problem where the production target has never been achieved and has not reached the company's scheme. Where from the results of research that has been carried out during the month of September it is known that the actual calculations in the field by measuring each variable above the conveyor belt the resulting capacity for split 2/3 namely 77 TPH, to split 1/2, 156.70 TPH, and for rock ash 94.01 TPH. When compared between the actual calculation with the target capacity of the company from the entire conveyor belt is still 94% from the target and shows less than optimal performance. From the production per September 2019 from the company produced is 72204 tons / month where this result is still 79% of the desired production target achieved by the company. The obstacle factor is the material from the quarry to be processed into the crushing plant unit, where the material losses that are not included in the primary crushing are 14.80% and the incoming material amounted to 85.19%. Other obstacles are maintenance of the equipment, weather conditions and the time the equipment is available affect the belt capacity where the willingness value for the belt conveyor tool in primary crushing (UA = 77.73%, PA = 89.58%, MA = 86.99%), and for conveyor belts in secondary crushing (UA = 77.5%, PA = 90.58%, MA = 88.17%). Evaluation is carried out on production targets, namely by reducing time standby because the value of willingness to use is still not maximal, perform maintenance of the tool properly and by adding material (feeding) from the mining results.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: belt conveyor, kapasitas, crushing plant, hambatan, target.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 7386 not found.
Date Deposited: 18 Aug 2020 03:39
Last Modified: 18 Aug 2020 03:39
URI: http://repository.unsri.ac.id/id/eprint/33252

Actions (login required)

View Item View Item