KAJIAN TEKNIS PEMBONGKARAN DAN BIAYA PENGEBORAN SERTA PELEDAKAN BATUAN ANDESIT DI BUKIT TAPUAN, TANJUNG ENIM

ARIYATI, ANNISA OCTAVIANIE and Mukiat, Mukiat and Handayani, Harminuke Eko (2020) KAJIAN TEKNIS PEMBONGKARAN DAN BIAYA PENGEBORAN SERTA PELEDAKAN BATUAN ANDESIT DI BUKIT TAPUAN, TANJUNG ENIM. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181722011.pdf] Text
RAMA_31201_03021181722011.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_31201_03021181722011_TURNITIN.pdf] Text
RAMA_31201_03021181722011_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (19MB) | Request a copy
[thumbnail of RAMA_31201_03021181722011_0022115801_0009026905_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181722011_0022115801_0009026905_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021181722011_0022115801_0009026905_02.pdf] Text
RAMA_31201_03021181722011_0022115801_0009026905_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (391kB) | Request a copy
[thumbnail of RAMA_31201_03021181722011_0022115801_0009026905_03.pdf] Text
RAMA_31201_03021181722011_0022115801_0009026905_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (481kB) | Request a copy
[thumbnail of RAMA_31201_03021181722011_0022115801_0009026905_04.pdf] Text
RAMA_31201_03021181722011_0022115801_0009026905_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (189kB) | Request a copy
[thumbnail of RAMA_31201_03021181722011_0022115801_0009026905_05.pdf] Text
RAMA_31201_03021181722011_0022115801_0009026905_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (81kB) | Request a copy
[thumbnail of RAMA_31201_03021181722011_0022115801_0009026905_06_ref.pdf] Text
RAMA_31201_03021181722011_0022115801_0009026905_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (87kB) | Request a copy
[thumbnail of RAMA_31201_03021181722011_0022115801_0009026905_07_lamp.pdf] Text
RAMA_31201_03021181722011_0022115801_0009026905_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy

Abstract

PT. Bukit Asam Tbk, in particular utilizes andesite reserves to be mined for the benefit of all. The research begins with conducting literature studies, field studies and data collection with the help of special tools such as a stopwatch, camera, control ball, and meter. Then perform data analysis using qualitative methods (Split Desktop V.2.0 application) and quantitative (manual calculations and ms. Excel) in order to get a conclusion. By utilizing real andesite reserves, demolition activities such as drilling and blasting can be carried out. PT. Bukit Asam Tbk. has a blasting target of 410,000 bcm/year. The value of drilling productivity used at PT. Bukit Asam Tbk. amounting to 69.76-254.3 bcm / hour. The blasting was carried out seven times with an average powder factor value of 0.32 kg/bcm. The resulting fragmentation is in accordance with the company's target where the boulder percentage is not more than 25%. The fragmentation was excavated and loaded with the 200 pc komatsu backhoe with a total average productivity of 63.25 bcm/hour. The correlation between fragmentation and digging time, circulation time and backhoe productivity is low. This happened due to the influence of the difficult work field and the waiting time for loading equipment. Meanwhile, the drilling and blasting costs incurred by the company totaled Rp. 2,156,589.65/hour or the equivalent of Rp. 6,655.13/bcm.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Pemboran, Peledakan, Alat Gali Muat, Biaya Bordak
Subjects: T Technology > TN Mining engineering. Metallurgy > TN950-997 Building and ornamental stones
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 8846 not found.
Date Deposited: 13 Nov 2020 05:41
Last Modified: 13 Nov 2020 05:41
URI: http://repository.unsri.ac.id/id/eprint/37509

Actions (login required)

View Item View Item