PERENCANAAN TEKNIS PENGUPASAN OVERBURDEN (TANAH PENUTUP) PADA PENAMBANGAN BATUBARA STUDI KASUS PT ANDALAN ARTHA PRIMANUSA DI LOKASI IUP PT BUDI GEMA GEMPITA,LAHAT, SUMATERA SELATAN

GUNAWAN, MUHAMMAD INDRA and Hasjim, Machmud and Bochori, Bochori (2020) PERENCANAAN TEKNIS PENGUPASAN OVERBURDEN (TANAH PENUTUP) PADA PENAMBANGAN BATUBARA STUDI KASUS PT ANDALAN ARTHA PRIMANUSA DI LOKASI IUP PT BUDI GEMA GEMPITA,LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381621055.pdf] Text
RAMA_31201_03021381621055.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021381621055_TURNITIN.pdf] Text
RAMA_31201_03021381621055_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (25MB) | Request a copy
[thumbnail of RAMA_31201_03021381621055_8871510016_0025107401_01_Front_Ref.pdf]
Preview
Text
RAMA_31201_03021381621055_8871510016_0025107401_01_Front_Ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021381621055_8871510016_0025107401_02.pdf] Text
RAMA_31201_03021381621055_8871510016_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (562kB) | Request a copy
[thumbnail of RAMA_31201_03021381621055_8871510016_0025107401_03.pdf] Text
RAMA_31201_03021381621055_8871510016_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (251kB) | Request a copy
[thumbnail of RAMA_31201_03021381621055_8871510016_0025107401_04.pdf] Text
RAMA_31201_03021381621055_8871510016_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021381621055_8871510016_0025107401_05.pdf] Text
RAMA_31201_03021381621055_8871510016_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (99kB) | Request a copy
[thumbnail of RAMA_31201_03021381621055_8871510016_0025107401_06_ref.pdf] Text
RAMA_31201_03021381621055_8871510016_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (79kB) | Request a copy
[thumbnail of RAMA_31201_03021381621055_8871510016_0025107401_07_lamp.pdf] Text
RAMA_31201_03021381621055_8871510016_0025107401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (321kB) | Request a copy

Abstract

The overburden stripping is the removal of the overburden of the coal. The stripping overburden of coal mining on the site of PT AAP has an inconsistency at the end of each month. Re-planning is needed to achieve the annual production target of PT AAP with Stripping Ratio 4.1. In 30 days of October 2019, 696 hours, there are holidays on Fridays and operating delays. The availability factor of each month's tools vary according to the level of maintenanche this makes an impact on the monthly production target level so it needs to be re-established in October 2019 due to the number of tools of each fleet Affect the ever-changing actual state. Pergamin data mapping with Total Station Sokkia IM50 showed changes in mining elevation and geometry as well as the section Area changed from previous pit design planning. From the results of studies that have been conducted showed the effective working time that can be achieved in October 2019 as much as 539 hours so as to determine the ideal production target. Planning the target of stripping production using the average availability of equipment with Physical Availability (98%), Effesiensi work (83%). and an effective working time (539 hours) resulted in 3 fleet with a total production target of 375,747 BCM of overburden. In planning the final pit design based on the existing map, the geometry of the mine, the area of the section resulted in an October 2019 pit design as well as the mining direction in October 2019 with a target of 382,595 BCM overburden production. Keywords : Overburden, Production, Availabilty Factor, Pit Design.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Overburden, Produksi, Ketersediaan alat, Desain pit.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN263-271 Mineral deposits. Metallic ore deposits. Prospecting
T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 8984 not found.
Date Deposited: 24 Nov 2020 08:06
Last Modified: 24 Nov 2020 08:06
URI: http://repository.unsri.ac.id/id/eprint/37869

Actions (login required)

View Item View Item