Susanti, Betty (2019) LIFE CYCLE COST ANALYSIS OF A PBC PILOT PROJECT FOR ROAD IN INDONESIA. IIUM Engieering Journal, 20 (2). pp. 57-69. ISSN 2289-7860
Text (LIFE CYCLE COST ANALYSIS OF A PBC PILOT PROJECT FOR ROAD IN INDONESIA)
1075 Download (62kB) |
Abstract
Implementation of Performance-based Contracts (PBC) for road maintenance in Indonesia still requires various studies, especially related to potential long-term cost efficiencies that can be achieved by the road agencies by shifting the application of traditional contracts to PBC. This study assesses the effectiveness of PBC compared to traditional contract implementation based on a case study on one of the PBC pilot projects in Indonesia. The effectiveness of the PBC reviews in terms of project life cycle cost efficiency was calculated. LCC calculations were conducted by considering the influence of the length of contracted road, the initial conditions of contracted road, and the duration of PBC project. The LCC calculation shows that the implementation of PBC generally has the potential to generate LCC efficiency compared to the traditional contract. This study also proved that the implementation of PBC can guarantee the performance of road services during multi-year contracts and also provide other benefits for the road agency and road users.
Item Type: | Article |
---|---|
Subjects: | A General Works > AC Collections. Series. Collected works > AC1-195 Collections of monographs, essays, etc. |
Divisions: | 03-Faculty of Engineering > 22201-Civil Engineering (S1) |
Depositing User: | Dr Betty Susanti |
Date Deposited: | 08 Feb 2021 04:35 |
Last Modified: | 08 Feb 2021 04:35 |
URI: | http://repository.unsri.ac.id/id/eprint/38875 |
Actions (login required)
View Item |