Penerapan Konsep Earned Value Pada Proyek Konstruksi Jalan Tol (Studi Kasus Ruas Jalan Tol Kayuagung - Palembang -Betung)
(1) Department of Civil Engineering, Universitas Sriwijaya
(2) Department of Civil Engineering, Universitas Sriwijaya
(3) Department of Civil Engineering, Universitas Sriwijaya
(*) Corresponding Author
DOI: https://doi.org/10.25077/jrs.15.1.12-20.2019
Copyright (c) 2019 Betty Susanti, Melisah, Ika Juliantina
Abstract
Keywords
Full Text:
PDFReferences
Acebes, A., Pajares, J., Galan, J. M., dan Parede, A. L. (2013), Beyond Earned Value Management: A Graphical Framework for Integrated Cost, Schedule and Risk Monitoring, Procedia - Social and Behavioral Sciences, 74, 181-189.
Association for Project Management (APM). (2013). Earned Value Management Handbook, ISBN. 978-1-903494-47-9.
Burke, R. (2003). Project Management. Planning and Control Techniques, John Wiley & Sons.
Cleland, D. L. (1995). Project Management Strategic Design and Implementation, Singapore : Mc. Graw-Hill, New York.
Czarnigowska, A. (2008). Earned Value Method as a Tool for Project Control. Architektura, 3, 15-32
Czemplik, A. (2014). Application of Earned Value Method to Progress Control of Construction Projects, Procedia Engineering, 91, 424-428.
Dodson, M., Defavari, G., dan Carvalho, V. (2015), Quality: The Third Element of Earned Value Management. Procedia Computer Science, 64, 932-939,
Ganapathy, R. (2015). Analysis of Project Performance Using Earned Value Analysis. International Journal of Science, Engineering and Technology Research (IJSETR), 4(4), 1080-1085.
Jadhav, V. V. dan Shinde, R. D. (2018). Application of Earned Value Management System In Infrastructure Projects - A Review. International Research Journal of Engineering and Technology (IRJET), 5(7), 270-272.
Khamidi, M. F., Ali, W., dan Idrus, A. (2011). Application of Earned Value Management System on an Infrastructure Project: A Malaysian Case Study. Proceeding of International Conference on Management and Service Science IPEDR Vol. 8. Retrieved from http://www.ipedr.com/vol8/1-A00006.pdf.
Maromo, M. I. dan Indryani, R. (2015). Metode Earned Value untuk Analisa Kinerja Biaya dan Waktu Pelaksanaan pada Proyek Pembangunan Condotel De Vasa Surabaya. Jurnal Teknik Sipil ITS, 4(1), D54-D59.
Milind, P. dan Saji, G. (2013). Earned Value Analysis in Project Management: Survey and Research Potential. Retrieved from https://www.pomsmeetings.org/ConfPapers/060/060-1448.pdf.
Project Management Institute (PMI). (2005). A Guide to the Project Management Body of Knowledge, Third Edition.
Virle, R.G. dan Mhaske, S. Y. (2013). Monitoring Of Construction Projects Using EVM and ESM Tools. International Journal of Structural and Civil Engineering Research, 2(4), 128-135. Retrieved from http://www.ijscer.com/uploadfile/2015/0429/20150429081634283.pdf
Jurnal Rekayasa Sipil (JRS)-Universitas Andalas (Unand). ISSN: 1858-2133 (print) & 2477-3484 (online)
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
View JRS-Unand Stats