NAFIS, M. DARUN and Ibrahim, Eddy (2020) KAJIAN TEKNIS PEMINDAHAN JALAN ANGKUT FRONT PIT 4-ROM 2 PADA PT.DZIMARTA POWERINDO LAHAT SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
Text
RAMA_31021_03021381520060.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (7MB) | Request a copy |
|
Preview |
Text
RAMA_31021_03021381520060_0022116203_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) | Preview |
Text
RAMA_31021_03021381520060_0022116203_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (318kB) | Request a copy |
|
Text
RAMA_31021_03021381520060_0022116203_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (246kB) | Request a copy |
|
Text
RAMA_31021_03021381520060_0022116203_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (576kB) | Request a copy |
|
Text
RAMA_31021_03021381520060_0022116203_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (95kB) | Request a copy |
|
Text
RAMA_31021_03021381520060_0022116203_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (133kB) | Request a copy |
|
Text
RAMA_31021_03021381520060_0022116203_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (4MB) | Request a copy |
|
Text
RAMA_31021_03021381520060_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (5MB) | Request a copy |
Abstract
When the coal price keeps going down. PT. Dizamatra Powerindo decided to find a new way to increase production but decrease the cost of mining. Based on this decision engineer plan to cut short hauling road which impact the decrease of transportation cost and keep increase the production. This new road planned to had 100 m for maximum elevation and 1 km length with the hope that it will shorten the cycle time. After realization of new road, the comparison is the old road capable of 167.876ton/month coal with cycle time 24,67 minutes and range 3078,95 m. Meanwhile the production of new road production increases up to 24.202 ton/month becomes 192.078 ton/month with cycle time 21,69 minutes dan range 2951,85. The cost to make new road estimated RP512.699.711,00 and calculated to cut the cost Rp445,00/ton.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Geometri jalan, Superelevasi, Produktivitas |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Users 10500 not found. |
Date Deposited: | 04 Feb 2021 08:26 |
Last Modified: | 04 Feb 2021 08:26 |
URI: | http://repository.unsri.ac.id/id/eprint/42080 |
Actions (login required)
View Item |