ANALISIS JALAN ANGKUT UNTUK OPTIMALISASI FUEL RATIO ALAT ANGKUT PADA KEGIATAN PENGANGKUTAN OVERBURDEN DI PT TUNAS JAYA PERKASA, KABUPATEN TANAH LAUT, KALIMANTAN SELATAN

PANGGABEAN, AGUNG WIBAWA and Arief, A Taufik and Purbasari, Diana (2021) ANALISIS JALAN ANGKUT UNTUK OPTIMALISASI FUEL RATIO ALAT ANGKUT PADA KEGIATAN PENGANGKUTAN OVERBURDEN DI PT TUNAS JAYA PERKASA, KABUPATEN TANAH LAUT, KALIMANTAN SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281621031.pdf] Text
RAMA_31201_03021281621031.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_31201_03021281621031_TURNITIN.pdf] Text
RAMA_31201_03021281621031_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_31201_03021281621031_0009096303_0017048203_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281621031_0009096303_0017048203_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Preview
[thumbnail of RAMA_31201_03021281621031_0009096303_0017048203_02.pdf] Text
RAMA_31201_03021281621031_0009096303_0017048203_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (424kB) | Request a copy
[thumbnail of RAMA_31201_03021281621031_0009096303_0017048203_03.pdf] Text
RAMA_31201_03021281621031_0009096303_0017048203_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_31201_03021281621031_0009096303_0017048203_04.pdf] Text
RAMA_31201_03021281621031_0009096303_0017048203_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (969kB) | Request a copy
[thumbnail of RAMA_31201_03021281621031_0009096303_0017048203_05.pdf] Text
RAMA_31201_03021281621031_0009096303_0017048203_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (17kB) | Request a copy
[thumbnail of RAMA_31201_03021281621031_0009096303_0017048203_06_ref.pdf] Text
RAMA_31201_03021281621031_0009096303_0017048203_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021281621031_0009096303_0017048203_07_lamp.pdf] Text
RAMA_31201_03021281621031_0009096303_0017048203_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy

Abstract

PT Tunas Jaya Perkasa is one of coal mining contractor that operates in Tanah laut district, South Borneo Province, with the coal production target in July 2020 is 60.054 tonne, and the overburden production target is 860.484 BCM. Mining operation was conducted with open pit method on 2 pit which was UCE pit and U210 pit. UCE pit hauling road length is 2053 m with higher elevation changes than U210 pit, while U210 pit hauling roal length is 1736 m with worse road condition than UCE pit. For overburden removal operation PT TJP use a combination of Komatsu PC400 excavator dan Quester CWE370 dump truck. To achieve those production target, fuel gives very large contribution on operating cost. From the fuel usage data in PT TJP the average fuel consumption of Quester CWE 370 in both pit is still over company standard 11 litre/hour which is 11,87 litre/hour. This research is aimed to determine haul road geometry that corespond with safety standard, evaluate the effect of haul road geometry and condition on fuel consumption, to analyze fuel consumption on each haul road, and to find the the proper measure to achieve better production and fuel consumption. From field observation there’s still exist road segment that is not in accordance with KepMen ESDM No 1827 K/30/MEM/2018. Fuel ratio calculation was done using rimpull method. Fuel consumption calculation using actual speed on UCE pit is 10,05 litre/hour and on U210 pit is 11,02 litre/hour with the fuel ratio on UCE pit is 0,400 litre/BCM and on U210 pit is 0,311 litre/BCM. From theoritical calculation the usage of planned UCE road design can reduce the usage of fuel as much as 0,018 litre/BCM and saves Rp 139.777.662 in overburden removal fuel cost during September 2020.

Item Type: Thesis (Undergraduate)
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
T Technology > TP Chemical technology > TP315-360 Fuel
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 13532 not found.
Date Deposited: 29 Jul 2021 07:40
Last Modified: 29 Jul 2021 07:40
URI: http://repository.unsri.ac.id/id/eprint/50860

Actions (login required)

View Item View Item