EVALUASI PENGARUH GEOMETRI JALAN ANGKUT TERHADAP WAKTU TRAVEL DUMP TRUCK DARI PIT SEAM J MENUJU STOCKPILE TALANG AKAR DI PT ERA ENERGI MANDIRI, LAHAT, SUMATERA SELATAN

PUTRA, ARMA YOGA KURNIA and Bochori, Bochori and Purbasari, Diana (2021) EVALUASI PENGARUH GEOMETRI JALAN ANGKUT TERHADAP WAKTU TRAVEL DUMP TRUCK DARI PIT SEAM J MENUJU STOCKPILE TALANG AKAR DI PT ERA ENERGI MANDIRI, LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281722076_0025107401_0017048203_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281722076_0025107401_0017048203_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021281722076_0025107401_0017048203_02.pdf] Text
RAMA_31201_03021281722076_0025107401_0017048203_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (551kB) | Request a copy
[thumbnail of RAMA_31201_03021281722076_0025107401_0017048203_03.pdf] Text
RAMA_31201_03021281722076_0025107401_0017048203_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (354kB) | Request a copy
[thumbnail of RAMA_31201_03021281722076_0025107401_0017048203_04.pdf] Text
RAMA_31201_03021281722076_0025107401_0017048203_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021281722076_0025107401_0017048203_05.pdf] Text
RAMA_31201_03021281722076_0025107401_0017048203_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (14kB) | Request a copy
[thumbnail of RAMA_31201_03021281722076_0025107401_0017048203_06_ref.pdf] Text
RAMA_31201_03021281722076_0025107401_0017048203_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (133kB) | Request a copy
[thumbnail of RAMA_31201_03021281722076_0025107401_0017048203_07_lamp.pdf] Text
RAMA_31201_03021281722076_0025107401_0017048203_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021281722076.pdf] Text
RAMA_31201_03021281722076.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021281722076_TURNITIN.pdf] Text
RAMA_31201_03021281722076_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (12MB) | Request a copy

Abstract

The ideal mine haul road will optimize production results in accordance with the planned production targets. The coal production target at PT EEM in December is 42,000 tonnes, while the actual production is 12,700 tonnes. One of the reasons for this inactivity was due to the very long travel time for the dump truck from Pit Seam J to Stockpile Talang Akar. This is caused by less than ideal haul road geometry, such as less than ideal road width, too high grade, not ideal cross slope etc. The purpose of this study is to determine the actual haul road geometry, assess the actual haul road conditions in the field with the results of mathematical calculations based on AASHTO provisions, compare travel dump truck times before and after haul road geometry improvements, determine the factors that affect the haul roads. Based on the research results, the mine haul road layout design was obtained from Pit Seam J to Stockpile Talang Akar with 92 segments. The actual haul road geometry has a straight road width between 5.04-27.30 meters, a bend road width between 6.45-31.15 meters, a super elevation between 0-0.09 meters with a bend radius of 16.14 -106.30 meters, road grade between 0.15-25.99% and cross slope between 0-0.48 m / m. Based on the calculation of road geometry using the AASHTO provisions, there are still many that have not up to standards, except for the radius of the bend. The travel time for the dump truck before repair was 57.93 minutes, while after the repair it was 14.21 minutes in a loaded state and 10.40 minutes in an empty state, so the total time was 24.61 minutes. Mine haul roads are affected by safety embankments, drainage and road signs.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: jalan angkut, alat angkut, geometri jalan, waktu travel
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Arma Yoga Kurnia Putra
Date Deposited: 29 Jul 2021 02:41
Last Modified: 29 Jul 2021 02:41
URI: http://repository.unsri.ac.id/id/eprint/50871

Actions (login required)

View Item View Item