ANALISIS BIAYA PENGUPASAN DAN PENGANGKUTAN OVERBURDEN DENGAN TARGET PRODUKSI 400.000 BCM/BULAN DI PIT 3 TIMUR BANKO BARAT PT BUKIT ASAM (PERSERO), TBK.

AL KAUTSAR, AL KAUTSAR and Mukiat, Mukiat and Abuamat HAK, Abuamat HAK (2018) ANALISIS BIAYA PENGUPASAN DAN PENGANGKUTAN OVERBURDEN DENGAN TARGET PRODUKSI 400.000 BCM/BULAN DI PIT 3 TIMUR BANKO BARAT PT BUKIT ASAM (PERSERO), TBK. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281320042.pdf] Text
RAMA_31201_03021281320042.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (67MB) | Request a copy
[thumbnail of RAMA_ 31201_ 03021281320042_ 0022115801 _01_front_ref.pdf]
Preview
Text
RAMA_ 31201_ 03021281320042_ 0022115801 _01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Preview
[thumbnail of RAMA_ 31201_ 03021281320042_ 0022115801 _02.pdf] Text
RAMA_ 31201_ 03021281320042_ 0022115801 _02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_ 31201_ 03021281320042_ 0022115801 _03.pdf] Text
RAMA_ 31201_ 03021281320042_ 0022115801 _03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_ 31201_ 03021281320042_ 0022115801 _04.pdf] Text
RAMA_ 31201_ 03021281320042_ 0022115801 _04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (49kB) | Request a copy
[thumbnail of RAMA_ 31201_ 03021281320042_ 0022115801 _05.pdf] Text
RAMA_ 31201_ 03021281320042_ 0022115801 _05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10kB) | Request a copy
[thumbnail of RAMA_ 31201_ 03021281320042_ 0022115801 _06.ref.pdf] Text
RAMA_ 31201_ 03021281320042_ 0022115801 _06.ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (12kB) | Request a copy
[thumbnail of RAMA_ 31201_ 03021281320042_ 0022115801 _07_lamp.pdf] Text
RAMA_ 31201_ 03021281320042_ 0022115801 _07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT Bukit Asam (Persero) Tbk, engaged in mining activities at West Banko Site. In the overburden stripping or digging of coal, the company surely expenses costs to do mining from front to dumping area including: digging, loading, and hauling. in 2016, The Company of Bukit Asam expended the production cost of overburden stripping in amount 35,101 IDR/bcm using mechanical tool based on fuel oil. In 2017, The Company of Bukit Asam will do mining using Electric Steam Power Plant owned by The Company itself which is expected to reduce the production costs of overburden stripping. Production costs include fixed cost and variable cost that must be issued by the company. Fixed cost consists of depretiation, interest, tax, and insurance. Variable cost includes fuel, lubricating oil, replacement of undercarriage/tire, replacement of filter, repairs and maintenance, and operator salaries. To obtain the quantity of production cost, it will be did a research at the productivity of digging-loading and hauling tool. Next, research fixed and variable cost. From the data obtained, production costs of overburden stripping will be found. From the result of the research, the productivity of digging-loading tool Shovel Komatsu PC 3000 is 802.05 bcm/h and the productivity of hauling tool Rigid Truck Belaz is 116.72 bcm/h. Fixed cost of digging-loading tool is 2,577,801 IDR/h that consists of depreciation cost is 2,277,433 IDR/h and costs of interest, tax, and insurance are 300,368 IDR/h. Variable cost of digging-loading tool is 3,063,016.84 IDR/h that consists of electric charge is 606,799.71 IDR/h, lubricating oil cost is 70,792 IDR/h, undercarriage replacement cost is 355,556 IDR/h, filter replacement cost is 41,958 IDR/h, repair and maintenance cost is 1,966,183.86 IDR/h and operator salaries are 22,727.27 IDR/h. Fixed cost of 7 hauling tools is 5,239,204 IDR/h that includes depreciation cost is 4,628,727 IDR/h, interest, tax, and insurance are 610,478 IDR/h. Variable cost is 11,117,551.38 IDR/h that consists of fuel oil is 3,074,222.96 IDR/h, lubricant oil replacement cost is 202,079.22 IDR/h, replacement of tires cost is 3,420,452 IDR/h, replacement of filter cost is 264,572 IDR/h, repair and maintenace cost is 3,996,134.3 IDR/h, and operator salaries are 159,090.9 IDR/h. The result of calculating produces the production cost of digging-loading tool is 7,030.3 IDR/bcm and the production cost of hauling tool is 20,393.68 IDR/bcm, so that the production cost of overburden stripping must be issued by the company in pit 3 east at West Banko in July 2017 was 27,423.98 IDR/bcm.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Productivity, cost, electrification
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 12 not found.
Date Deposited: 01 Sep 2019 09:17
Last Modified: 16 Feb 2024 03:21
URI: http://repository.unsri.ac.id/id/eprint/5215

Actions (login required)

View Item View Item