PERENCANAAN PENAMBANGAN BATUBARA DAN DISPOSAL OVERBUDEN DALAM MENCAPAI TARGET PRODUKSI PADA TAHUN 2021 DI PIT LDA, PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN

JAYARANA, WAHYU and Handayani, Rr Harminuke Eko and Bochori, Bochori (2021) PERENCANAAN PENAMBANGAN BATUBARA DAN DISPOSAL OVERBUDEN DALAM MENCAPAI TARGET PRODUKSI PADA TAHUN 2021 DI PIT LDA, PT BUDI GEMA GEMPITA, LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281722062_0009026905_0025107401_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281722062_0009026905_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (660kB) | Preview
[thumbnail of RAMA_31201_03021281722062_0009026905_0025107401_02.pdf] Text
RAMA_31201_03021281722062_0009026905_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (349kB) | Request a copy
[thumbnail of RAMA_31201_03021281722062_0009026905_0025107401_03.pdf] Text
RAMA_31201_03021281722062_0009026905_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (810kB) | Request a copy
[thumbnail of RAMA_31201_03021281722062_0009026905_0025107401_04.pdf] Text
RAMA_31201_03021281722062_0009026905_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021281722062_0009026905_0025107401_05.pdf] Text
RAMA_31201_03021281722062_0009026905_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (114kB) | Request a copy
[thumbnail of RAMA_31201_03021281722062_0009026905_0025107401_06_ref.pdf] Text
RAMA_31201_03021281722062_0009026905_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (299kB) | Request a copy
[thumbnail of RAMA_31201_03021281722062_0009026905_0025107401_07_lamp.pdf] Text
RAMA_31201_03021281722062_0009026905_0025107401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021281722062.pdf] Text
RAMA_31201_03021281722062.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021281722062_TURNITIN.pdf] Text
RAMA_31201_03021281722062_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy

Abstract

PT Budi Gema Gempita is a mining company with coal commodities located in Lahat district, South Sumatra Province. 2021 Expansion of the mining area in section 2 as a step to achieve the company's annual production target, the specified production target is 1,100,000 tons of coal with a maximum stripping ratio (SR) of 4 bcm/ton. Placement of overburden disposal is planned by backfilling in the final pit plan area. The mining plan consists of a mining pit design and overburden removal for an annual period. The pit design is based on the area plan, production target, and mining geometry. Meanwhile, the design of the discharge design is made based on the selection of the disposal plan location, the appearance of the exhaust geometry, and the amount of overburden removed from the design pit design. The design is made through minescape 5.7 software. Research produces an annual plan on the available area plans. Total reserves are 1,258,737 tons of coal and 4,396,813 bcm of overburden, SR value of 3.49 bcm/ton, with an opening area of 40 Ha. The direction of progress is planned to extend to the south and west areas of the existing pit in a down-dip (lowwall to highwall) to the lowest elevation of RL +-24. Overburden stockpiling is planned by backfilling in the final pit area with a maximum distance of 1.6 km

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Perencanaan, Pit, Disposal
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 7593 not found.
Date Deposited: 26 Aug 2021 07:21
Last Modified: 26 Aug 2021 07:21
URI: http://repository.unsri.ac.id/id/eprint/52751

Actions (login required)

View Item View Item