ANALISIS TEKNIS KINERJA ALAT GALI-MUAT EXCAVATOR CATERPILLAR EC03 6030BH DAN ALAT ANGKUT DUMP TRUCK KOMATSU DK17 HD785 DALAM MEMENUHI TARGET PRODUKSI BATU KAPUR 9.000.000 TON TAHUN 2021 DI PT SEMEN PADANG SUMATERA BARAT

ILHAM, ARLI GUSTIAN and Juniah, Restu and Prabu, Ubaidillah Anwar (2021) ANALISIS TEKNIS KINERJA ALAT GALI-MUAT EXCAVATOR CATERPILLAR EC03 6030BH DAN ALAT ANGKUT DUMP TRUCK KOMATSU DK17 HD785 DALAM MEMENUHI TARGET PRODUKSI BATU KAPUR 9.000.000 TON TAHUN 2021 DI PT SEMEN PADANG SUMATERA BARAT. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381722128.pdf] Text
RAMA_31201_03021381722128.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021381722128_TURNITIN.pdf] Text
RAMA_31201_03021381722128_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (12MB) | Request a copy
[thumbnail of RAMA_31201_03021381722128_0027066701_0018105502_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021381722128_0027066701_0018105502_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (881kB) | Preview
[thumbnail of RAMA_31201_03021381722128_0027066701_0018105502_02.pdf] Text
RAMA_31201_03021381722128_0027066701_0018105502_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (380kB) | Request a copy
[thumbnail of RAMA_31201_03021381722128_0027066701_0018105502_03.pdf] Text
RAMA_31201_03021381722128_0027066701_0018105502_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (218kB) | Request a copy
[thumbnail of RAMA_31201_03021381722128_0027066701_0018105502_04.pdf] Text
RAMA_31201_03021381722128_0027066701_0018105502_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (505kB) | Request a copy
[thumbnail of RAMA_31201_03021381722128_0027066701_0018105502_05.pdf] Text
RAMA_31201_03021381722128_0027066701_0018105502_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10kB) | Request a copy
[thumbnail of RAMA_31201_03021381722128_0027066701_0018105502_06_ref.pdf] Text
RAMA_31201_03021381722128_0027066701_0018105502_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (85kB) | Request a copy
[thumbnail of RAMA_31201_03021381722128_0027066701_0018105502_07_lamp.pdf] Text
RAMA_31201_03021381722128_0027066701_0018105502_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

One company that produces limestone to meet the needs of domestic infrastructure development is PT. Padang Cement. Given the growing demand for cement in Indonesia, PT. Semen Padang wants to increase its limestone production. To increase the production of PT. Semen Padang makes plans for limestone production targets every year to evaluate the production of limestone that has been mined. To determine the production of limestone each year, it is necessary to analyze the productivity of the digging equipment and transportation equipment in order to meet the planned production target, because PT. Semen Padang wants to analyze the actual productivity of the digging and loading equipment so that the planned production can be achieved. So that a technical analysis of the productivity of digging and loading equipment is needed that can be used in order to meet the limestone production target of 9,000,000 tons by 2021 at PT. Semen Padang West Sumatra can be achieved The purpose of this study is to determine the performance of the digging equipment and transportation equipment that has been planned to be able to achieve the limestone production target of 9,000,000 tons at PT. Padang Cement. The method used is to collect and process primary and secondary data, to obtain the correct and correct results from the technical analysis of the performance of the digging and loading equipment. From the results of the study, From the results of the analysis, the actual productivity of digging and loading equipment in 2021 did not reach the production target set by the company, which was 9,000,000 tons / year, so improvements must be made. Where the productivity of digging and loading equipment is 8,463,539 tons and the productivity for conveyance is 8,094,384 tons. After repairs were made at the time of work barriers, so that the actual productivity of digging and loading equipment and transportation equipment has reached the 2021 production target of 9,000,000 tons . Where the productivity of the digging tool is 9,178,749 tons and the productivity of the conveyance is 9,120,428 tons. In this improvement, an increase in work efficiency was carried out from 71% to 80% so that the production target set by the company of 9,000,000 tons in 2021 could be achieved.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Batu Kapur, Kinerja Alat Mekanis, Peningkatan, Produktivitas
Subjects: T Technology > T Technology (General) > T58.7-58.8 Production capacity. Manufacturing capacity > T58.8 Productivity. Efficiency Standardization Cf. TA368 Standards (Collections, indexes, etc.)
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: ARLI GUSTIAN ILHAM
Date Deposited: 06 Sep 2021 06:07
Last Modified: 06 Sep 2021 06:07
URI: http://repository.unsri.ac.id/id/eprint/53469

Actions (login required)

View Item View Item