ANALISIS KEEKONOMIAN PENGUPASAN OVERBURDEN DI PT. LANGGENG DAYA AGRINDO, LAHAT, SUMATERA SELATAN

EQUATORIO, ANDRE and Mukiat, Mukiat and Suherman, Adang (2021) ANALISIS KEEKONOMIAN PENGUPASAN OVERBURDEN DI PT. LANGGENG DAYA AGRINDO, LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181722013.pdf] Text
RAMA_31201_03021181722013.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021181722013_0022115801_0016035602_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181722013_0022115801_0016035602_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (610kB) | Preview
[thumbnail of RAMA_31201_03021181722013_0022115801_0016035602_02.pdf] Text
RAMA_31201_03021181722013_0022115801_0016035602_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (547kB) | Request a copy
[thumbnail of RAMA_31201_03021181722013_0022115801_0016035602_03.pdf] Text
RAMA_31201_03021181722013_0022115801_0016035602_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (529kB) | Request a copy
[thumbnail of RAMA_31201_03021181722013_0022115801_0016035602_04.pdf] Text
RAMA_31201_03021181722013_0022115801_0016035602_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (590kB) | Request a copy
[thumbnail of RAMA_31201_03021181722013_0022115801_0016035602_05.pdf] Text
RAMA_31201_03021181722013_0022115801_0016035602_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (71kB) | Request a copy
[thumbnail of RAMA_31201_03021181722013_0022115801_0016035602_06_ref.pdf] Text
RAMA_31201_03021181722013_0022115801_0016035602_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (192kB) | Request a copy
[thumbnail of RAMA_31201_03021181722013_0022115801_0016035602_07_lamp.pdf] Text
RAMA_31201_03021181722013_0022115801_0016035602_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (783kB) | Request a copy
[thumbnail of RAMA_31201_03021181722013_TURNITIN.pdf] Text
RAMA_31201_03021181722013_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy

Abstract

In May 2021, PT Langgeng Daya Agrindo's overburden stripping achievement was 223,956 bcm from the set target of 312,869 bcm. Based on observations in the field, there are several factors that cause the unachieved stripping target, one of which is the discrepancy between the actual cycle time of 40,12 seconds and the planned 26 seconds-28 seconds. From the calculations carried out using the discounted cashflow method, the net present value is Rp. 41,989.101.746.30, the Internal rate of return is 24%, the Payback period is 3.14 years and the break even point is 10.706.728.71 bcm. Then due to market conditions that are always in a state of uncertainty, sensitivity analysis is needed with an increase and decrease in operating costs and revenue of 0%, 5% and 10%. 41,989,101,746.30 while the lowest NPV was produced in conditions of a 10% decrease in revenue of Rp. 15,731,592,407.81, the highest IRR was obtained by normal market conditions of 24.2% while the lowest was produced in conditions of a 10% decline in revenue of 13.4%, the fastest PBP was produced under normal market conditions for 3.14 years while the longest PBP was in 10% decrease in revenue is 4.17 years, and the lowest BEP is produced in normal market conditions of 10,706,728.71 bcm, while the highest BEP value is produced by 10% revenue decline of 14,167,991.69 bcm or the cost to be paid is Rp. 256.961.488.959,75.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: overburden, analisis, ekonomi, investasi, pengupasan
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 11235 not found.
Date Deposited: 20 Jan 2022 06:35
Last Modified: 20 Jan 2022 06:35
URI: http://repository.unsri.ac.id/id/eprint/62005

Actions (login required)

View Item View Item