EVALUASI CAPAIAN PRODUKSI ALAT BULLDOZER RIPPER D155A SERTA ALAT GALI MUAT DAN ANGKUT UNTUK MENCAPAI TARGET PRODUKSI PENGUPASAN OVERBURDEN PADA PT. DUTA ALAM SUMATERA, LAHAT, SUMATERA SELATAN

SARI, EVA TRI INDAH and Rahman, A and Abro, M Akib (2021) EVALUASI CAPAIAN PRODUKSI ALAT BULLDOZER RIPPER D155A SERTA ALAT GALI MUAT DAN ANGKUT UNTUK MENCAPAI TARGET PRODUKSI PENGUPASAN OVERBURDEN PADA PT. DUTA ALAM SUMATERA, LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181722025.pdf] Text
RAMA_31201_03021181722025.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021181722025_0027035604_9900986578_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181722025_0027035604_9900986578_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (578kB) | Preview
[thumbnail of RAMA_31201_03021181722025_0027035604_9900986578_02.pdf] Text
RAMA_31201_03021181722025_0027035604_9900986578_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (265kB) | Request a copy
[thumbnail of RAMA_31201_03021181722025_0027035604_9900986578_03.pdf] Text
RAMA_31201_03021181722025_0027035604_9900986578_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (195kB) | Request a copy
[thumbnail of RAMA_31201_03021181722025_0027035604_9900986578_04.pdf] Text
RAMA_31201_03021181722025_0027035604_9900986578_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (128kB) | Request a copy
[thumbnail of RAMA_31201_03021181722025_0027035604_9900986578_05.pdf] Text
RAMA_31201_03021181722025_0027035604_9900986578_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (30kB) | Request a copy
[thumbnail of RAMA_31201_03021181722025_0027035604_9900986578_06_ref.pdf] Text
RAMA_31201_03021181722025_0027035604_9900986578_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (29kB) | Request a copy
[thumbnail of RAMA_31201_03021181722025_0027035604_9900986578_07_lamp.pdf] Text
RAMA_31201_03021181722025_0027035604_9900986578_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (677kB) | Request a copy
[thumbnail of RAMA_31201_03021181722025_TURNITIN.pdf] Text
RAMA_31201_03021181722025_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy

Abstract

The achievement of overburden stripping production at PT. Duta Alam Sumatera, Lahat, South Sumatera in January to March amounted to 448,864 bcm from the production target of 890,000 bcm. The realization of overburden stripping production did not reach the target so that it was detrimental to the company as the owner of the Mining Business License Area. If the production target is not achieved, it is necessary to evaluate the bulldozer ripper as well as digging and hauling equipment. The purpose of this study was to determine the production achievement of bulldozer ripper and digging and hauling equipment and the factors causing production failure. This study compares the calculation of real production in the field and theoretical production. The theoretical overburden stripping production calculation did not reach the target of 453.600 bcm. The results of the study indicate that the means of transportation are the cause of the inability to achieve production and the influencing factors include the circulation time of the cycle time, work efficiency or less than optimal supervision. Therefore, improvements must be made to the obstacles that affect so that production can be increased.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Ketercapaian, Produksi, Waktu edar, Effisiensi
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Eva Tri Indah Sari
Date Deposited: 31 Jan 2022 06:58
Last Modified: 31 Jan 2022 06:58
URI: http://repository.unsri.ac.id/id/eprint/63370

Actions (login required)

View Item View Item