ANALISIS PENGARUH FRAGMENTASI PADA PELEDAKAN BATUAN ANDESIT TERHADAP PRODUKTIVITAS ALAG GALI MUAT DI QUARRY BUKIT TAPUAN PT. BUKIT ASAM TBK., TANJUNG ENIM, SUMATERA SELATAN

HIDAYATULLAH, RACHMAT and Toha, Muhammad Taufik and Rahman, A (2021) ANALISIS PENGARUH FRAGMENTASI PADA PELEDAKAN BATUAN ANDESIT TERHADAP PRODUKTIVITAS ALAG GALI MUAT DI QUARRY BUKIT TAPUAN PT. BUKIT ASAM TBK., TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381621058.pdf] Text
RAMA_31201_03021381621058.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021381621058_TURNITIN.pdf] Text
RAMA_31201_03021381621058_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021381621058_0014085301_0027035604_01_FRONT_REF.pdf]
Preview
Text
RAMA_31201_03021381621058_0014085301_0027035604_01_FRONT_REF.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (801kB) | Preview
[thumbnail of RAMA_31201_03021381621058_0014085301_0027035604_02.pdf] Text
RAMA_31201_03021381621058_0014085301_0027035604_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (387kB) | Request a copy
[thumbnail of RAMA_31201_03021381621058_0014085301_0027035604_03.pdf] Text
RAMA_31201_03021381621058_0014085301_0027035604_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (578kB) | Request a copy
[thumbnail of RAMA_31201_03021381621058_0014085301_0027035604_04.pdf] Text
RAMA_31201_03021381621058_0014085301_0027035604_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (277kB) | Request a copy
[thumbnail of RAMA_31201_03021381621058_0014085301_0027035604_05.pdf] Text
RAMA_31201_03021381621058_0014085301_0027035604_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (111kB) | Request a copy
[thumbnail of RAMA_31201_03021381621058_0014085301_0027035604_06_REF.pdf] Text
RAMA_31201_03021381621058_0014085301_0027035604_06_REF.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (118kB) | Request a copy
[thumbnail of RAMA_31201_03021381621058_0014085301_0027035604_07_LAMP.pdf] Text
RAMA_31201_03021381621058_0014085301_0027035604_07_LAMP.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT. Bukit Asam Tbk memiliki tambang batu andesit yang di beri nama Quarry Bukit Tapuan. Dalam melakukan kegiatan penambangannya, PT. Bukit Asam Tbk menggunakan metode pemboran dan peledakan. Peledakan di Quarry Bukit Tapuan menggunakan geometri peledakan aktual rata-rata yang digunakan yaitu diameter lubang ledak 3 inch, burden 2, m, spasi 2,52 m, stemming 1,44 m, kedalaman lubang 4 m, dan powder factor 0,20 Kg/BCM. PT. Bukit Asam Tbk. Menggunakan alat gali muat Excavator Komatsu PC-200 di wilayah bukit tapuan dengan kapasitas bucket 1 m^3. Hasil analisis ukuran fragmentasi menggunakan metode image analysis menggunakan program aplikasi split desktop. Berdasarkan hasil pengamatan, ukuran fragmentasi P ≤ 50cm, persentase tertinggi dengan persentase 99% terjadi pada peledakan tanggal 9 november 2019 dan 15 November 2019. dari 5 peledakan yang diamati, hanya peledakan pada tanggal 4 Desember 2019 yang ukuran P ≥ 50cm yang melewati batasan ukuran yang ditetapkan oleh perusahaan dengan batasan ≥ 50cm sebesar 20% yaitu sebesar 23%. Dari hasil pengamatan dilapangan, nilai digging time tercepat sebesar 7,31 detik sedangkan nilai digging time terlama yaitu sebesar 7,96 detik. Nilai cycle time tercepat didapatkan sebesar 16,80 detik sedangkan nilai cycle time terlama didapatkan sebesar 22,46 detik. Dari 5 peledakan yang dilakukan hasil perhitungan produktivitas, peledakan pada tanggal 4 Desember 2019 yang tidak memenuhi target produksi yang ditetapkan oleh perusahaan sebesar 200 ton/jam yaitu sebesar 169,27 ton/jam. Hasil produktivitas terbesar terjadi pada tanggal 9 November 2019 dengan hasil produktivitas sebesar 226,30 ton/jam.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Batuan Andesit, Fragmentasi, Digging Time, Cycle Time, Produktivitas
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Rachmat Hidayatullah
Date Deposited: 02 Feb 2022 08:06
Last Modified: 02 Feb 2022 08:07
URI: http://repository.unsri.ac.id/id/eprint/64294

Actions (login required)

View Item View Item