ANALISIS OVERALL EQUIPMENT EFFECTIVENESS (OEE) EXCAVATOR BACKHOE PADA PENGUPASAN OVERBURDEN DI PT TUNAS JAYA PERKASA PIT U2-10 KABUPATEN TANAH LAUT KALIMANTAN SELATAN

PARHUSIP, ANTONIUS PERDHINANDO and Mukiat, Mukiat and Ningsih, Yunita Bayu (2021) ANALISIS OVERALL EQUIPMENT EFFECTIVENESS (OEE) EXCAVATOR BACKHOE PADA PENGUPASAN OVERBURDEN DI PT TUNAS JAYA PERKASA PIT U2-10 KABUPATEN TANAH LAUT KALIMANTAN SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281722053.pdf] Text
RAMA_31201_03021281722053.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021281722053_TURNITIN.pdf] Text
RAMA_31201_03021281722053_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (9MB) | Request a copy
[thumbnail of RAMA_31201_03021281722053_0022115801_0023037801_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281722053_0022115801_0023037801_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (355kB) | Preview
[thumbnail of RAMA_31201_03021281722053_0022115801_0023037801_02.pdf] Text
RAMA_31201_03021281722053_0022115801_0023037801_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (423kB) | Request a copy
[thumbnail of RAMA_31201_03021281722053_0022115801_0023037801_03.pdf] Text
RAMA_31201_03021281722053_0022115801_0023037801_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (395kB) | Request a copy
[thumbnail of RAMA_31201_03021281722053_0022115801_0023037801_04.pdf] Text
RAMA_31201_03021281722053_0022115801_0023037801_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (355kB) | Request a copy
[thumbnail of RAMA_31201_03021281722053_0022115801_0023037801_05.pdf] Text
RAMA_31201_03021281722053_0022115801_0023037801_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11kB) | Request a copy
[thumbnail of RAMA_31201_03021281722053_0022115801_0023037801_06_ref.pdf] Text
RAMA_31201_03021281722053_0022115801_0023037801_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (138kB) | Request a copy
[thumbnail of RAMA_31201_03021281722053_0022115801_0023037801_07_lamp.pdf] Text
RAMA_31201_03021281722053_0022115801_0023037801_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

The availability of tools and lost working time are the main issues for every mining company to improve the efficiency and performance of mining activities. Overall Equipment Effectiveness (OEE) is a metric for measuring the performance of equipment or a production system by measuring three main ratios, namely availability, performance, and quality. The analysis is carried out by detecting the factors that cause lost time and their effect on production time to detect an opportunity to increase equipment production. This study analyzes the performance of the tools used for mining operations at PT Tunas Jaya Perkasa Pit U2-10, namely the backhoe excavator which consists of 6 units, namely 2 Komatsu PC400 units, 2 Hitachi ZX470 units and 2 CAT349DL units. Data collection is done by direct observation of the time loss that occurs in each time component in the tool cycle time. Secondary data is taken from the fleet activity monitoring sheet by the Production Department and PT Tunas Jaya Perkasa Data Center.The final results obtained that the excavator backhoe OEE ratio of EX 810, EX 815, EX 851, EX 853, EX 856, EX 858 was 62.29%, respectively; 66.09%; 61.57%; 72.57%; 79.55%; 85.33% and after improvement it increased to 73.97%; 76.81%; 73.58%; 78.08%; 81.85%; and 88.54%. The biggest performance improvement opportunities are found in the availability and performance factors caused by equipment failure, idle time, weather, loading queue time, doing P2H and backhoe unproductive maneuvering time. Keywords: OEE, Availability, Performance, Quality, Excavator Backhoe, Time, Production

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: OEE, Availability, Performance, Quality, Excavator Backhoe, Time, Production
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Mr. Antonius Perdhinando Parhusip
Date Deposited: 23 Mar 2022 07:14
Last Modified: 23 Mar 2022 07:14
URI: http://repository.unsri.ac.id/id/eprint/66712

Actions (login required)

View Item View Item