DESAIN FINAL PIT PENAMBANGAN BATUBARA UNTUK MEMENUHI TARGET PRODUKSI 960.000 TON/TAHUN DI PIT 6 TAMBANG BUKIT TAMBI KABUPATEN BATANGHARI JAMBI

SEMBIRING, HASTORIN and Juniah, Restu and Syarifudin, Syarifudin (2021) DESAIN FINAL PIT PENAMBANGAN BATUBARA UNTUK MEMENUHI TARGET PRODUKSI 960.000 TON/TAHUN DI PIT 6 TAMBANG BUKIT TAMBI KABUPATEN BATANGHARI JAMBI. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281621115.pdf] Text
RAMA_31201_03021281621115.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021281621115_TURNITIN.pdf] Text
RAMA_31201_03021281621115_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021281621115_0027066701_0004097401_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281621115_0027066701_0004097401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (747kB) | Preview
[thumbnail of RAMA_31201_03021281621115_0027066701_0004097401_02.pdf] Text
RAMA_31201_03021281621115_0027066701_0004097401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (340kB) | Request a copy
[thumbnail of RAMA_31201_03021281621115_0027066701_0004097401_03.pdf] Text
RAMA_31201_03021281621115_0027066701_0004097401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (410kB) | Request a copy
[thumbnail of RAMA_31201_03021281621115_0027066701_0004097401_04.pdf] Text
RAMA_31201_03021281621115_0027066701_0004097401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (267kB) | Request a copy
[thumbnail of RAMA_31201_03021281621115_0027066701_0004097401_05.pdf] Text
RAMA_31201_03021281621115_0027066701_0004097401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (33kB) | Request a copy
[thumbnail of RAMA_31201_03021281621115_0027066701_0004097401_06_ref.pdf] Text
RAMA_31201_03021281621115_0027066701_0004097401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (142kB) | Request a copy
[thumbnail of RAMA_31201_03021281621115_0027066701_0004097401_07_lamp.pdf] Text
RAMA_31201_03021281621115_0027066701_0004097401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT. Bukit Tambi Mine is a private company engaged in the coal mining business, located in Batanghari district, Jambi. Monthly coal production target at PT. The Bukit Tambi mine is 80,000 tonnes. PT. Bukit Tambi Mine plans to open a new pit, namely Pit 6 to replace pit 4 which is almost reaching the mining limit. Pit 6 is designed using AutoCAD2017 software and CivilSurpac 6.6.2 which is divided into two mining stages. The design of pit 6 is expected to meet the target stripping ratio of 5:1. In the design pit block 1 has a total coal reserve of 492,370 tons and volume of overburden 1,181,129 BCM with a stripping ratio of 2.4. The digging and loading equipment needed are 2 digging tools and 15 hauling tools in coal mining as well as 3 loading and unloading tools and 10 conveyances forstripping overburden. Thematch factor resultingis 0.45 for coal mining and 0.86 forstripping overburden. In the design of pit block 2, it has a total coal reserve of 493,023 tons and volume of 1,482,009 overburden BCM with a stripping ratio of 3. The digging and loading equipment needed are 2 digging tools and 15 transportation equipment in coal mining as well as 3 digging tools and 12 conveyances forstripping overburden. Thematch factor resultingis 0.45 for coal mining and 0.82 for stripping overburden.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: overburden, Stripping Ratio, Match Factor, Block penambangan.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Mr. Hastorin Sembiring
Date Deposited: 28 Mar 2022 06:07
Last Modified: 28 Mar 2022 06:07
URI: http://repository.unsri.ac.id/id/eprint/67225

Actions (login required)

View Item View Item