AKBAR, ILYAS AKMAL and Sariman, Sariman (2022) PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA PADA KOMPLEK PERUMAHAN NASKAH INDAH II, KECAMATAN SUKARAMI PALEMBANG. Undergraduate thesis, Sriwijaya University.
Text
RAMA_20201_03041381722111.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
|
Text
RAMA_20201_03041381722111_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (3MB) | Request a copy |
|
Preview |
Text
RAMA_20201_03041381722111_0007075802_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) | Preview |
Text
RAMA_20201_03041381722111_0007075802_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (622kB) | Request a copy |
|
Text
RAMA_20201_03041381722111_0007075802_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (388kB) | Request a copy |
|
Text
RAMA_20201_03041381722111_0007075802_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (392kB) | Request a copy |
|
Text
RAMA_20201_03041381722111_0007075802_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (182kB) | Request a copy |
|
Text
RAMA_20201_03041381722111_0007075802_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (393kB) | Request a copy |
|
Text
RAMA_20201_03041381722111_0007075802_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
Abstract
PLTS was chosen because its utilization does not cause pollution that can Damaging the environment. There are two types of PLTS systems, namely, Off- Grid and On-Grid. The On-Grid system uses a circuit that is connected to the PLN network. Meanwhile, Off-Grid PLTS relies on solar energy as the only main energy source. Sunlight is a form of energy from natural resources. This solar natural resource has been widely used to supply electrical power in communication satellites through solar cells. The total load on this housing is 267.5 kWh, for the total cost of PLTS (25 years) = Initial investment + Additional operational costs + battery replacement for 25 years = Rp. 1,280,098,000,000 + Rp. 126,969,000 + Rp. 448,000,000 = Rp. 128,249,098,000 Based on the total cost of PLTS for 25 years, the annual costs obtained are: Total annual cost = Total cost of PV mini-grid (25 years) / 25 = Rp. 1,855,067,000. / 25 = Rp. 74,420,637. And the daily cost for using PLTS for 25 years is Rp. 74,420,637./ 365 = Rp.203,295.50. 1. In planning the PLTS in the beautiful script II housing complex, 175 500 Wp solar panels are used, 28 12 V 1000ah batteries, 7 5,000 Watt inverters, and 7 controllers. to reduce the use of fossil energy and minimize the increase in global warming due to excessive use of fossil energy. Because the solar power system does not require fuel at the time of operation, the resources for PLTS are abundant.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | PERENCANAAN, PEMBANGKIT LISTRIK TENAGA SURYA |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2896-2985 Production of electricity by direct energy conversion > TK2960.R35 Solar batteries. Photovoltaic power generation. |
Divisions: | 03-Faculty of Engineering > 20201-Electrical Engineering (S1) |
Depositing User: | Users 20075 not found. |
Date Deposited: | 08 Apr 2022 06:25 |
Last Modified: | 08 Apr 2022 06:25 |
URI: | http://repository.unsri.ac.id/id/eprint/68755 |
Actions (login required)
View Item |