BIAYA PENANGANAN SAMPAH DI AREA LAYANAN TPA SIMPANG GEGAS KABUPATEN MUSI RAWAS

MUHAMMAD, SAEH and Hadinata, Febrian (2022) BIAYA PENANGANAN SAMPAH DI AREA LAYANAN TPA SIMPANG GEGAS KABUPATEN MUSI RAWAS. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011281823064.pdf] Text
RAMA_22201_03011281823064.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_22201_03011281823064_TURNITIN.pdf] Text
RAMA_22201_03011281823064_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_22201_03011281823064_0025028101_01_front_ref.pdf]
Preview
Text
RAMA_22201_03011281823064_0025028101_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_22201_03011281823064_0025028101_02.pdf] Text
RAMA_22201_03011281823064_0025028101_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_22201_03011281823064_0025028101_03.pdf] Text
RAMA_22201_03011281823064_0025028101_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (925kB) | Request a copy
[thumbnail of RAMA_22201_03011281823064_0025028101_04.pdf] Text
RAMA_22201_03011281823064_0025028101_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_22201_03011281823064_0025028101_05.pdf] Text
RAMA_22201_03011281823064_0025028101_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (572kB) | Request a copy
[thumbnail of RAMA_22201_03011281823064_0025028101_06_ref.pdf] Text
RAMA_22201_03011281823064_0025028101_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (457kB) | Request a copy
[thumbnail of RAMA_22201_03011281823064_0025028101_07_lamp.pdf] Text
RAMA_22201_03011281823064_0025028101_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy

Abstract

With the increase in the amount of waste, it must be accompanied by improvements in waste handling infrastructure. To support the development of waste management, it is necessary to plan the development of a waste management system and projected waste handling costs. This study is focused on estimating the cost of handling waste in the Simpang Gegas TPA service area by applying 4 scenarios for handling waste, each scenario consisting of waste collection, waste storage, waste transportation and final waste processing, and there is a waste reduction process. waste management is based on Permendagri No. 7 of 2021, in which the cost calculation consists of calculating investment costs, operational costs and the total cost of handling waste. 4 scenarios are planned, among others. In Scenario 1, it is planned to add 2 more trucks per year using the static countertainer system method. In scenario 1, the estimated operational costs that must be spent are Rp. 644,700,-/ton of waste, and the total cost of handling waste is Rp. 867,900,-/Ton of garbage. Then scenario 2 is planned to add 2 trucks per year using the hauled container system method. In scenario 2, it is estimated that the operational cost of handling waste is Rp. 795,600,-/ton of waste, and the total cost of handling waste is Rp. 1.052.100,-/ton of waste. Scenario 3 and scenario 4 are based on a plan to fulfill JAKSTRANAS 2017, namely with 70% transportation and 30% reduction. In scenario 3 the transportation is planned using the SCS method, and the estimated operational costs are Rp. 664,400,-/ton of waste, and the estimated total cost of handling waste is Rp. 827,500,-/ton of waste. And in scenario 4 the transportation system is planned using the HCS method, and the estimated operational costs are Rp. 557,400,-/ton and the estimated total cost of handling waste is Rp.696,400,-/ton of waste

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Biaya, Penanganan Sampah, Operasional, Investasi
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA177.4-185 Engineering economy
T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: mr saeh muhammad
Date Deposited: 18 May 2022 01:44
Last Modified: 18 May 2022 01:44
URI: http://repository.unsri.ac.id/id/eprint/70141

Actions (login required)

View Item View Item