ANALISIS RENCANA REKLAMASI DAN RENCANA PASCATAMBANG PT TAMBULUN PAGIAN INDAH DI DESA RANTAU IKIL KECAMATAN JUJUHAN KABUPATEN BUNGO PROVINSI JAMBI.

PERMANA, IRFAN SATRIA and Toha, M. Taufik and Nurhayati, Nurhayati (2022) ANALISIS RENCANA REKLAMASI DAN RENCANA PASCATAMBANG PT TAMBULUN PAGIAN INDAH DI DESA RANTAU IKIL KECAMATAN JUJUHAN KABUPATEN BUNGO PROVINSI JAMBI. Master thesis, Sriwijaya University.

[thumbnail of RAMA_31101_03042681822003.pdf] Text
RAMA_31101_03042681822003.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31101_03042681822003_TURNITIN.pdf] Text
RAMA_31101_03042681822003_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_31101_03042681822003_8864000016_0002026203_01_front_ref.pdf]
Preview
Text
RAMA_31101_03042681822003_8864000016_0002026203_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (928kB) | Preview
[thumbnail of RAMA_31101_03042681822003_8864000016_0002026203_02.pdf] Text
RAMA_31101_03042681822003_8864000016_0002026203_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (664kB) | Request a copy
[thumbnail of RAMA_31101_03042681822003_8864000016_0002026203_03.pdf] Text
RAMA_31101_03042681822003_8864000016_0002026203_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (677kB) | Request a copy
[thumbnail of RAMA_31101_03042681822003_8864000016_0002026203_04.pdf] Text
RAMA_31101_03042681822003_8864000016_0002026203_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31101_03042681822003_8864000016_0002026203_05.pdf] Text
RAMA_31101_03042681822003_8864000016_0002026203_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (188kB) | Request a copy
[thumbnail of RAMA_31101_03042681822003_8864000016_0002026203_06_ref.pdf] Text
RAMA_31101_03042681822003_8864000016_0002026203_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (401kB) | Request a copy
[thumbnail of RAMA_31101_03042681822003_8864000016_0002026203_07_lamp.pdf] Text
RAMA_31101_03042681822003_8864000016_0002026203_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

SUMMARY COAL TECHNOLOGY MINING ENGINEERING MASTER STUDY PROGRAM POSTGRADUATE FACULTY OF ENGINEERING SRIWIJAYA UNIVERSITY Scientific papers in the form of thesis, 22 July 2022 Irfan Satria Permana; supervised by Prof. Dr. Ir. M. Taufik Toha, DEA. and Prof. Dr. Ir. Nurhayati, M.Si. Analysis of reclamation plans and post-mining plans at PT. Tambulun Pagian Indah, Rantau Ikil Village, Jujuhan District, Bungo Regency, Jambi Province xv + 74 pages, 26 tables, 12 images, 15 attachments Mining industry provides benefits to the state in mining as a source of state revenue and foreign exchange earner, Utilization of natural resources in openly coal mining in the forest did to get these benefits, but on the other hand cause environmental harm. Various regulations have been made, including the Government Regulation of the Republic of Indonesia Number 78 year 2010, number 3 tahun 2020 and dan Government Regulation number 22 tahun 2021 requires the mining company give up money of funds as guarantee for reclamation and post-mining. This research was conducted at PT Tambulun Pangian Indah (PT TPI) in the District Bungo Jambi Province. PT TPI have yet to examine the cost of reclamation and post-mining well, The reclamation succed criteria and post-mining cannot be measured clearly. This research aims to examine the suitability costs of reclamation and post-mining with guarantees reclamation and post-mining those have been handed out to Governments District Bungo. Research methods does field research, interviews with the authorities in charge of the discussion guarantee reclamation and post-mining in the Office of Energy and Mineral Resources District Jambi and evaluate the calculation cost of reclamation and post-mining PT TPI refers Ministry of Energy and Mineral Resources Regulation Number 1827 year 2018. The cost of reclamation and post-mining include direct costs, comprising the costs of land use planning activities, revegetation, prevention of mitigation and acid mine drainage, civil work, social and cultural as well as the dismantling of the mining facility. Whereas indirect costs comprise the cost of mobilization and demobilization, the planning reclamation and post-mining, contractor profit and administration as well as costs of supervision Based on the research results obtained the cost of reclamation and post-mining PT TPI amount Rp 325.102.612.446,67, whereas the results of interviews with the officials in charge discussion of guarantee reclamation and post-mining, PT TPI in 2015 until the research was done, gave guarantee of reclamation and post-mining amount Rp 70.000.000.000,-. Based on guarantee of reclamation and post-mining PT TPI and research study results there are difference amount Rp 255.102.612.446,67. Based on guarantee of reclamation and post-mining PT TPI amount Rp 70.000.000.000,-, an activity that can be done the operation and post-mining period are the regulation of waste dump on 36,7 ha. Hence the reclamation and post-mining PT TPI votes have yet to comply with the Minister of Energy and Mineral Resources Regulation Number 1827 year 2018. Benefit of this research, be expected to maximize function of reclamation, guarantee reclamation and post-mining function to be precise in accordance with the cost of reclamation and post-mining. The Regional Government of Regency Jambi would be monitoring and compliance guidance for guarantee reclamation and post-mining for creation of productive mining. Keywords: Guarantee of Reclamation, Post-mining, PT TPI Summary: 36 (2011-2021)

Item Type: Thesis (Master)
Uncontrolled Keywords: Teknik Pertambangan, Lingkungan Pertambangan, Reklamasi
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31101-Mining Engineering (S2)
Depositing User: Irfan Satria Permana
Date Deposited: 08 Aug 2022 03:46
Last Modified: 08 Aug 2022 03:46
URI: http://repository.unsri.ac.id/id/eprint/75200

Actions (login required)

View Item View Item