EVALUASI TEKNIS GEOMETRI JALAN TAMBANG UNTUK MENINGKATKAN PRODUKTIVITAS ALAT ANGKUT PADA PENAMBANGAN BATUBARA DI PT BIMA PUTRA ABADI CITRANUSA, LAHAT, SUMATERA SELATAN

SAPUTRA, ANDIKA MEFA and Bochori, Bochori and Ningsih, RR. Yunita Bayu (2022) EVALUASI TEKNIS GEOMETRI JALAN TAMBANG UNTUK MENINGKATKAN PRODUKTIVITAS ALAT ANGKUT PADA PENAMBANGAN BATUBARA DI PT BIMA PUTRA ABADI CITRANUSA, LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281823034.pdf] Text
RAMA_31201_03021281823034.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021281823034_TURNITIN.pdf] Text
RAMA_31201_03021281823034_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy
[thumbnail of RAMA_31201_03021281823034_0025107401_0023037801_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281823034_0025107401_0023037801_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Preview
[thumbnail of RAMA_31201_03021281823034_0025107401_0023037801_02.pdf] Text
RAMA_31201_03021281823034_0025107401_0023037801_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (609kB) | Request a copy
[thumbnail of RAMA_31201_03021281823034_0025107401_0023037801_03.pdf] Text
RAMA_31201_03021281823034_0025107401_0023037801_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (392kB) | Request a copy
[thumbnail of RAMA_31201_03021281823034_0025107401_0023037801_04.pdf] Text
RAMA_31201_03021281823034_0025107401_0023037801_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (878kB) | Request a copy
[thumbnail of RAMA_31201_03021281823034_0025107401_0023037801_05.pdf] Text
RAMA_31201_03021281823034_0025107401_0023037801_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (189kB) | Request a copy
[thumbnail of RAMA_31201_03021281823034_0025107401_0023037801_06_ref.pdf] Text
RAMA_31201_03021281823034_0025107401_0023037801_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (298kB) | Request a copy
[thumbnail of RAMA_31201_03021281823034_0025107401_0023037801_07_lamp.pdf] Text
RAMA_31201_03021281823034_0025107401_0023037801_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

The ideal mine haul road will optimize production results in accordance with the planned production targets. The coal production target at PT Bima Putra Abadi Citranusa is 300,000 tons per month, while the actual production is 237,450 tons per month. One of the reasons for this failure was due to the less than ideal haul road geometry, such as less than ideal road width, too high grade and so on, so that the dump truck travel time from pit seam A1 to the Talang root stockpile became very long. The purpose of this study was to determine the actual haul road geometry, to examine the actual haul road conditions in the field with the results of mathematical calculations based on AASHTO provisions, to compare the productivity of dump trucks before and after the haul road geometry repair, to determine the factors that affect haul roads. Based on the results of the study, the mine haul road layout design was obtained from pit seam A1 to the Talang root stockpile with 89 segments. The actual haul road geometry has a straight road width between 5.99-30.46 meters, a bend road width between 5.37-27.62 meters, a superelevation between 0.00-0.314 meters with a bend radius between 13.44-112 .15 meters and road grade between 0.029-19.28%. Based on the calculation of road geometry using the AASHTO provisions, there are still many that do not meet the standards. Dump truck cycle time before repair is 55.25 minutes, while after repair it is 17.62 minutes loaded and 15.97 minutes empty, so the total time is 33.59 minutes. Mine haul roads are affected by safety embankments, drainage, road signs and water tank sprinkling.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Jalan Angkut, Alat Angkut, Geometri Jalan, Cycle Time
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Andika Mefa Saputra
Date Deposited: 29 Jul 2022 03:26
Last Modified: 29 Jul 2022 03:26
URI: http://repository.unsri.ac.id/id/eprint/75209

Actions (login required)

View Item View Item