EVALUASI ALAT PENGUPASAN OVERBURDEN UNTUK MENCAPAI TARGET PRODUKSI DI SITE MUARA TIGA BESAR UTARA PT BUKIT ASAM. TBK UNIT PENAMBANGAN TANJUNG ENIM

SILITONGA, SAUR HAMONANGAN and Bochori, Bochori and Purbasari, Diana (2022) EVALUASI ALAT PENGUPASAN OVERBURDEN UNTUK MENCAPAI TARGET PRODUKSI DI SITE MUARA TIGA BESAR UTARA PT BUKIT ASAM. TBK UNIT PENAMBANGAN TANJUNG ENIM. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_0302118152023.pdf] Text
RAMA_31201_0302118152023.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_0302118152023_TURNITIN.pdf] Text
RAMA_31201_0302118152023_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021181520023_0025107401_0017048203_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181520023_0025107401_0017048203_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021181520023_0025107401_0017048203_02.pdf] Text
RAMA_31201_03021181520023_0025107401_0017048203_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (400kB) | Request a copy
[thumbnail of RAMA_31201_03021181520023_0025107401_0017048203_03.pdf] Text
RAMA_31201_03021181520023_0025107401_0017048203_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (346kB) | Request a copy
[thumbnail of RAMA_31201_03021181520023_0025107401_0017048203_04.pdf] Text
RAMA_31201_03021181520023_0025107401_0017048203_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (627kB) | Request a copy
[thumbnail of RAMA_31201_03021181520023_0025107401_0017048203_05.pdf] Text
RAMA_31201_03021181520023_0025107401_0017048203_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (114kB) | Request a copy
[thumbnail of RAMA_31201_03021181520023_0025107401_0017048203_06_ref.pdf] Text
RAMA_31201_03021181520023_0025107401_0017048203_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (21kB) | Request a copy
[thumbnail of RAMA_31201_03021181520023_0025107401_0017048203_07_lamp.pdf] Text
RAMA_31201_03021181520023_0025107401_0017048203_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

Based on PT Bukit Asam's 10-200R2 package contract system. Tbk with the Contractor, mining activities include digging and loading equipment and transportation equipment, namely excavator backhoes with Komatsu PC 2000, PC 1250 and PC 800 types, and the material is then transported by Dump Truck to a landfill or disposal area using a Komatsu HD Dump Truck. 785 and Dump Truck Hino 500 FM 320 TI. Planning tools for overburden stripping with an overall production target for March 2020 of 1,709,000 BCM for Muara Tiga Besar Utara. The production target is 1,709,000 BCM, the western part of Muara Tiga Besar Utara has a target of 1,441,000 BCM while the eastern part of Muara Tiga Besar Utara is 268,000 BCM. In accordance with the 10-200R2 package contract regarding the distribution of digging-loading equipment and transportation equipment, it has been determined that the West Muara Tiga Besar section uses 9 fleets with 40 HD 785 dump trucks served and 6 DT Hino 500 FM320TI dump trucks. Meanwhile, the eastern part of Muara Tiga Besar Utara uses 2 fleets served by 4 HD 785 dump trucks and 5 Hino 500 FM 320 TI dump trucks. The production target plan data for March 2020 before the start of research for the western part of Muara Tiga Besar Utara is 1,441,000 BCM, and for the eastern part of Muara Tiga Besar Utara, 268,000 BCM. Data from observations in March stated that the achievement of the target obtained a total productivity of 1,441,011,483 BCM for the western part of Muara Tiga Besar Utara, while for the eastern part of Muara Tiga Besar Utara it was obtained at 268,213.55 BCM. Therefore, optimization of the use of tools will be carried out mechanics for overburden stripping in accordance with the results of tool productivity obtained by observation, theory and contractors. After that, a comparison is made to achieve the production target with the results of field observations and theoretical results.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Perencanaan Alat, Alat Gali Muat, Produktivitas
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 22882 not found.
Date Deposited: 02 Aug 2022 07:02
Last Modified: 02 Aug 2022 07:02
URI: http://repository.unsri.ac.id/id/eprint/75669

Actions (login required)

View Item View Item