EVALUASI PRODUKSI ALAT GALI MUAT DAN ALAT ANGKUT PADA KEGIATAN PENGUPASAN OVERBURDEN DI PT KALIMANTAN PRIMA PERSADA JOBSITE PELH, KAB. LAHAT, SUMATERA SELATAN

ADLI, MGS M FADHIL and Asof, Marwan and Syarifuddin, Syarifuddin (2022) EVALUASI PRODUKSI ALAT GALI MUAT DAN ALAT ANGKUT PADA KEGIATAN PENGUPASAN OVERBURDEN DI PT KALIMANTAN PRIMA PERSADA JOBSITE PELH, KAB. LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181823013.pdf] Text
RAMA_31201_03021181823013.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021181823013_0011115805_0004097401_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181823013_0011115805_0004097401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (491kB) | Preview
[thumbnail of RAMA_31201_03021181823013_0011115805_0004097401_02.pdf] Text
RAMA_31201_03021181823013_0011115805_0004097401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (231kB) | Request a copy
[thumbnail of RAMA_31201_03021181823013_0011115805_0004097401_03.pdf] Text
RAMA_31201_03021181823013_0011115805_0004097401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (332kB) | Request a copy
[thumbnail of RAMA_31201_03021181823013_0011115805_0004097401_04.pdf] Text
RAMA_31201_03021181823013_0011115805_0004097401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (335kB) | Request a copy
[thumbnail of RAMA_31201_03021181823013_0011115805_0004097401_05.pdf] Text
RAMA_31201_03021181823013_0011115805_0004097401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11kB) | Request a copy
[thumbnail of RAMA_31201_03021181823013_0011115805_0004097401_06_ref.pdf] Text
RAMA_31201_03021181823013_0011115805_0004097401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (70kB) | Request a copy
[thumbnail of RAMA_31201_03021181823013_0011115805_0004097401_07_lamp.pdf] Text
RAMA_31201_03021181823013_0011115805_0004097401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (395kB) | Request a copy
[thumbnail of RAMA_31201_03021181823013_TURNITIN.pdf] Text
RAMA_31201_03021181823013_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy

Abstract

PT Kalimantan Prima Persada is an integrated mining industry service company, PT Kalimantan Prima Persada is a member of the PT Pama Persada Nusantara group of companies. The work area of PT Kalimantan Prima Persada Jobsite PELH is divided into two parts, namely the West Pit and the East Pit, currently being worked on the East Pit of PT Asta Maharanita with an IUP area of 476 Ha. The method used is open pit. In January 2022 the production plan for overburden stripping activities in the East Pit was 395,000 bcm / month, while the realization was only 350.630,244 bcm / month or around 88.7 % of the targeted production plan. This study aims to evaluate the achievement of overburden production, constraints that affect the achievement of overburden production and evaluate efforts to increase overburden production. The results of direct observation in the field of actual productivity of Komatsu PC 1250 and Komatsu HD 785 amounted to 687.90 BCM/hour and 229.26 BCM/hour. The factor that affects the achievement of production is low work efficiency. There are 15 obstacles that affect work efficiency. The work efficiency time is 509.8 hours/month with 210.2 hours/month obstacles which cause low work efficiency. So efforts are made to minimize obstacles that can be avoided, namely daily maintenance checks at the beginning of the shift, rest and meal, and shift change. So after making improvements to the obstacles that can be avoided, the obstacle time is obtained at 178.13 hours / month.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: target produksi, kendala kerja, produktivitas
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Mgs M Fadhil Adli
Date Deposited: 04 Nov 2022 05:37
Last Modified: 04 Nov 2022 05:37
URI: http://repository.unsri.ac.id/id/eprint/81385

Actions (login required)

View Item View Item