ANALISIS PENERAPAN PROGRAM KESELAMATAN DAN KESEHATAN KERJA (K3) SELAMA PANDEMI DI PT. HUTAMA KARYA (Persero) (STUDI KASUS: PROYEK PEMBANGUNAN JALAN TOL RUAS SIMPANG INDRALAYA - MUARA ENIM SEKSI SIMPANG INDRALAYA – PRABUMULIH)

BARA, AHMAD ALQOBAR and Fitriani, Heni (2022) ANALISIS PENERAPAN PROGRAM KESELAMATAN DAN KESEHATAN KERJA (K3) SELAMA PANDEMI DI PT. HUTAMA KARYA (Persero) (STUDI KASUS: PROYEK PEMBANGUNAN JALAN TOL RUAS SIMPANG INDRALAYA - MUARA ENIM SEKSI SIMPANG INDRALAYA – PRABUMULIH). Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011181722013.pdf] Text
RAMA_22201_03011181722013.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_22201_03011181722013_TURNITIN.pdf] Text
RAMA_22201_03011181722013_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_22201_03011181722013_0006057901_01_front_ref.pdf]
Preview
Text
RAMA_22201_03011181722013_0006057901_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Preview
[thumbnail of RAMA_22201_03011181722013_0006057901_02.pdf] Text
RAMA_22201_03011181722013_0006057901_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_22201_03011181722013_0006057901_05.pdf] Text
RAMA_22201_03011181722013_0006057901_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_22201_03011181722013_0006057901_03.pdf] Text
RAMA_22201_03011181722013_0006057901_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_22201_03011181722013_0006057901_04.pdf] Text
RAMA_22201_03011181722013_0006057901_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_22201_03011181722013_0006057901_06_ref.pdf] Text
RAMA_22201_03011181722013_0006057901_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_22201_03011181722013_0006057901_07_lamp.pdf] Text
RAMA_22201_03011181722013_0006057901_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy

Abstract

The Government of Indonesian Republic is currently focusing on increasing national economic growth through a development infrastructure equity program. In supporting the smooth running of infrastructure development activities, it must be followed by awareness by the application of OSH for workers and construction services, so that accidents and work-related illnesses do not occur. The level of awareness of the implementation of the K3 program is important to increase amid the Covid-19 pandemic. Several things were implemented during the Pandemic at PT. Hutama Karya, Such as the application of health insurance, work time violations and Work From Home. This study aims to determine the level of implementation of the K3 program during a pandemic at PT. Hutama Karya and analyzed the factors that were used to evaluate the OSH program during the pandemic. The type of research used is descriptive method with quantitative analysis, primary data obtained through distributing questionnaires. There were 30 respondents and the data from filling out the questionnaire was then processed using the SPSS series 25 application. The results showed that the implementation of the K3 Program during the pandemic as a whole was 82.63%, where the assessment was fulfilled, with the implementation in accordance with the Covid-19 Health Protocol.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Penerapan, Program K3 Pandemi, Prokes Covid-19, SPSS 25, Validitas, Reliabilitas
Subjects: K Law > K Law (General) > K3661-3674 Public safety
T Technology > T Technology (General) > T1-995 Technology (General) > T-54 Dangerous occupations. Industrial accidents see HD7262+ Industrial safety. Industrial accident prevention Cf. TA169.7 System safety Cf. TS175 Safety of consumer products
T Technology > TA Engineering (General). Civil engineering (General) > TA170-171 Environmental engineering
T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Ahmad Alqobar Bara
Date Deposited: 24 Nov 2022 04:11
Last Modified: 24 Nov 2022 04:11
URI: http://repository.unsri.ac.id/id/eprint/82583

Actions (login required)

View Item View Item