FAELRAVANI, M FARIZ and Toha, M Taufik (2022) KAJIAN TEKNIS PENGARUH TOTAL RESISTANCE TERHADAP PRODUKTIVITAS DUMP TRUCK TIPE SCANIA P360 PADA KEGIATAN PEMINDAHAN OVERBURDEN DI FLEET 1 PT DUTA BARA UTAMA, MUARA ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
Text
RAMA_31201_03021381823100.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) |
|
Text
RAMA_31201_03021381823100_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) |
|
Preview |
Text
RAMA_31201_03021381823100_0014085301_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (459kB) | Preview |
Text
RAMA_31201_03021381823100_0014085301_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (188kB) |
|
Text
RAMA_31201_03021381823100_0014085301_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (203kB) |
|
Text
RAMA_31201_03021381823100_0014085301_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (193kB) |
|
Text
RAMA_31201_03021381823100_0014085301_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (18kB) |
|
Text
RAMA_31201_03021381823100_0014085301_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (13kB) |
|
Text
RAMA_31201_03021381823100_0014085301_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (672kB) |
Abstract
Good hauling roads are a very influential factor in the smooth running of coal hauling activities and the process of achieving the hauling productivity targets set by the company. PT. Duta Bara Utama is a coal mining company that has various means of transportation in its mining process. Based on this, technical studies can be carried out regarding actual and theoretical calculations of total resistance in the overburden transport process as well as comparisons of actual total resistance calculations before repairs are carried out and theoretically after improvements are made to productivity in the process of transporting overburden from pit to disposal. Cycle time data is collected for productivity calculations, calculating the minimum haul road width, division of straight road segments and bends, cross slope, and depth of tire penetration. The productivity of the conveyance before repairs to the total resistance value was 30.34 Bcm/hour/unit with a cycle time of 9.49 minutes. The productivity of the conveyance after repairs to the total resistance value is 46.63 Bcm/unit with a cycle time of 7.567 minutes. The effect of the total resistance of the conveyance on the productivity of the means of conveyance is that the smaller the value of the total resistance, the shorter the circulation time so that the productivity of the means of transportation increases. It is necessary to maintain road geometry on a regular basis to increase the productivity of the transportation equipment so that the transportation equipment can work optimally thereby reducing cycle time and increasing production.
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | M Fariz Faelravani |
Date Deposited: | 30 Dec 2022 02:32 |
Last Modified: | 30 Dec 2022 02:32 |
URI: | http://repository.unsri.ac.id/id/eprint/84801 |
Actions (login required)
View Item |