PERMATASARI, ANGGRAINI and Kadarsa, Edi (2022) PERBANDINGAN METODE AASHTO 1993 DENGAN METODE PCA UNTUK DESAIN PERKERASAN JALAN YANG DILALUI KENDARAAN BEBAN OVERLOAD PADA JALAN SP. KOLIM - SP. MENARA PENGAMAT 33 KABUPATEN PENUKAL ABAB LEMATANG ILIR (PALI). Undergraduate thesis, Sriwijaya University.
Text
RAMA_22201_03011381722123.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (8MB) | Request a copy |
|
Text
RAMA_22201_03011381722123_TURNITIN.pdf Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (6MB) | Request a copy |
|
Preview |
Text
RAMA_22201_03011381722123_020311730_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (445kB) | Preview |
Text
RAMA_22201_03011381722123_0203117301_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (559kB) | Request a copy |
|
Text
RAMA_22201_03011381722123_0203117301_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (440kB) | Request a copy |
|
Text
RAMA_22201_03011381722123_0203117301_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (978kB) | Request a copy |
|
Text
RAMA_22201_03011381722123_0203117301_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (90kB) | Request a copy |
|
Text
RAMA_22201_03011381722123_0203117301_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (25kB) | Request a copy |
|
Text
RAMA_22201_03011381722123_0203117301_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (6MB) | Request a copy |
Abstract
Overload is a condition vehicle carrier payload exceeding the transport limit to load that has determined . Whereas Over Dimension is a provision where size vehicle no corresponding with criteria suit factory ( modification ) . Road section to Sp. Kolim – Sp. The original Watchtower 33 is road owned by company , however has legalized Becomes road special . this way is pavement heap land with a length of 25,000 meters and a width walk 10 meters. Research method this using the 1993 AASHTO Method (American Association of State Highway and Transportation Officials) and the PCA (Portland Cement Association) method . The aim of this research is for look for know method results thick pavement which one can count burden vehicle excess and yield ratio cost with price benchmark local . The results of the 1993 AASHTO method analysis get thick plate of 30 cm, lc of 10 cm, and the thickness of the foundation layer lower aggregate class A by 15cm. For results PCA method analysis was obtained thick plate by 26 cm, lc by 10 cm, and thick Foundation lower by 15 cm. The difference is also determined on the shoulder of the road used between second method namely the 1993 AASHTO Method, on the shoulder of the road used heap above it coated with expanse aggregate class S, so calculated costs _ from RAB ( Draft Budget Cost ) is obtained Rp . 194,571,409,790.-. While the shoulder of the road used in the PCA (Portland Cement Association) method is a concrete shoulder with spokes , so that in the calculation of the RAB ( Draft Budget Cost ) produce cost Rp . 213.160.559.011,- . After the data is analyzed AASHTO 1993 method is capable count burden vehicle excess or ODOL (Over Dimension Over Load) .
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Tebal Perkerasan, Metode AASHTO 1993, Metode PCA, Rancangan Anggaran Biaya (RAB) |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA1001-1280 Transportation engineering T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works |
Divisions: | 03-Faculty of Engineering > 22201-Civil Engineering (S1) |
Depositing User: | Anggraini Permatasari |
Date Deposited: | 19 Jan 2023 05:17 |
Last Modified: | 19 Jan 2023 05:17 |
URI: | http://repository.unsri.ac.id/id/eprint/86483 |
Actions (login required)
View Item |