ANALISIS PERCEPATAN DURASI PROYEK MENGGUNAKAN METODE CRASHING PADA PROYEK PEMBANGUNAN GEDUNG (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG MAPOLDA SUMATERA SELATAN)

MALAHAYATI, MALAHAYATI and Susanti, Betty (2022) ANALISIS PERCEPATAN DURASI PROYEK MENGGUNAKAN METODE CRASHING PADA PROYEK PEMBANGUNAN GEDUNG (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG MAPOLDA SUMATERA SELATAN). Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011181823025.pdf] Text
RAMA_22201_03011181823025.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (16MB) | Request a copy
[thumbnail of RAMA_22201_03011181823025_TURNITIN.pdf] Text
RAMA_22201_03011181823025_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_22201_03011181823025_0004018001_01_front_ref.pdf]
Preview
Text
RAMA_22201_03011181823025_0004018001_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_22201_03011181823025_0004018001_02.pdf] Text
RAMA_22201_03011181823025_0004018001_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (576kB) | Request a copy
[thumbnail of RAMA_22201_03011181823025_0004018001_03.pdf] Text
RAMA_22201_03011181823025_0004018001_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (40kB) | Request a copy
[thumbnail of RAMA_22201_03011181823025_0004018001_04.pdf] Text
RAMA_22201_03011181823025_0004018001_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_22201_03011181823025_0004018001_05.pdf] Text
RAMA_22201_03011181823025_0004018001_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (155kB) | Request a copy
[thumbnail of RAMA_22201_03011181823025_0004018001_06_Ref.pdf] Text
RAMA_22201_03011181823025_0004018001_06_Ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (235kB) | Request a copy
[thumbnail of RAMA_22201_03011181823025_0004018001_07_Lamp.pdf] Text
RAMA_22201_03011181823025_0004018001_07_Lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy

Abstract

Construction projects tend to experience delays, where there is a discrepancy between the planned schedule and the actual schedule. In an effort to overcome delays in the implementation of construction projects, project acceleration is carried out using the crashing method with the aim of knowing more efficient project durations at optimal costs. In this study, acceleration of project duration was carried out using the crashing method on the South Sumatra Police Headquarters building construction project because until the 12th week out of a total of 21 work weeks there was a delay with a deviation of 9.8592%, so crashing was carried out with an overtime scenario of 1 hour, 2 hours, 3 hours. hours and 4 hours. Based on the analysis that has been carried out where 1 hour of overtime causes the duration to be 56 days or 8.197% faster than the normal duration with a total cost of Rp. 17,948,240,706.00 or 0.021% more efficient than the normal total cost, 2 hours overtime causes the duration of the project to be 54 days or 11.475% faster than the normal duration with a total cost of Rp. 17,955,223,484.78 or 0.017% more expensive than the normal total cost, 3 hours overtime causes the duration to be 53 days or 13.115% faster than the normal duration with a total cost of Rp. 17,960,240,875.63 or 0.045% more expensive than the normal cost and 4 hours of overtime causes the duration of the project to be 51 days or 16.393% faster than the normal duration with a total cost of Rp. 18,017,220,228.36 or 0.363% more expensive than the normal fee. It can be concluded based on the analysis that has been carried out where 1 hour overtime is an alternative to accelerating project duration that is more efficient at optimal costs because the duration is 8.197% faster than the normal project duration and the total cost is 0.021% more efficient than the normal total project cost.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Project Acceleration, Crashing, Overtime
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Malahayati Malahayati
Date Deposited: 30 Jan 2023 08:00
Last Modified: 30 Jan 2023 08:00
URI: http://repository.unsri.ac.id/id/eprint/88509

Actions (login required)

View Item View Item