IBNU HAJAR, M and Yusuf, Maulana and Mukiat, Mukiat (2019) ANALISIS BIAYA PENGOLAHAN AIR ASAM TAMBANG DI KPL PIT-1 TIMUR BANKO BARAT. Undergraduate thesis, Sriwijaya University.
Text
RAMA_31201_03021181520137_.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
|
Text
RAMA_31201_03021181520137_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Download (4MB) | Request a copy |
|
Text
RAMA_31201_03021181520137_00250959003_0022115801_01_FRONT_REF.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) |
|
Text
RAMA_31201_03021181520137_00250959003_0022115801_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (517kB) | Request a copy |
|
Text
RAMA_31201_03021181520137_00250959003_0022115801_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (736kB) | Request a copy |
|
Text
RAMA_31201_03021181520137_00250959003_0022115801_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (468kB) | Request a copy |
|
Text
RAMA_31201_03021181520137_00250959003_0022115801_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (251kB) | Request a copy |
|
Text
RAMA_31201_03021181520137_00250959003_0022115801_06_REF.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (266kB) | Request a copy |
|
Text
RAMA_31201_03021181520137_00250959003_0022115801_07_LAMP.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
Abstract
Mine Acid Water Treatment is very important because according to the Decree of the Minister of Environment Number 113 of 2003 that every person in charge of a business or mining activity is obliged to process wastewater from mining and waste water from processing / washing activities so that the quality of wastewater those disposed of into the environment do not exceed waste water quality standards. Acid mine drainage treatment carried out in East Bank-West Pit-1 creates cost components, among others, pumping costs, liming costs, MPA maintenance costs, and capital costs. The results of the analysis of the costs of acid mine drainage treatment in East Pit-1 indicate the pumping cost of Rp. 1,229,292 / hour, calcification costs of Rp. 94,333.33 / hour, MPA maintenance costs of Rp. 653.95 / m3, and capital costs of Rp. 388,904 /hour. Based on the results of the analysis, the total cost of Rp. 1,712,529 / hour is obtained. With an average discharge per hour is 300.29 m3 / hour, the total cost of mine acid water treatment is Rp. 6,356.85 / m3.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Acid mine drainage, component costs, total costs |
Subjects: | Q Science > QE Geology > QE1-350.62 General. Including geographical divisions Q Science > QE Geology > QE1-996.5 Geology |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Administrator Library |
Date Deposited: | 26 Jul 2019 03:29 |
Last Modified: | 02 Aug 2019 07:53 |
URI: | http://repository.unsri.ac.id/id/eprint/901 |
Actions (login required)
View Item |