PERHITUNGAN RENCANA ANGGARAN BIAYA PEMBANGUNAN KOLAM RETENSI KOMPLEK PERKANTORAN TERPADU KERAMASAN - KOTA PALEMBANG

SYAHPUTRA, M.ILHAM and Juliantina, Ika and Susanti, Betty (2021) PERHITUNGAN RENCANA ANGGARAN BIAYA PEMBANGUNAN KOLAM RETENSI KOMPLEK PERKANTORAN TERPADU KERAMASAN - KOTA PALEMBANG. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011281621049.pdf] Text
RAMA_22201_03011281621049.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (43MB) | Request a copy
[thumbnail of RAMA_22201_03011281621049_TURNITIN.pdf] Text
RAMA_22201_03011281621049_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13MB) | Request a copy
[thumbnail of RAMA_22201_03011281621049_0001076005_0004018001_01_front_ref.pdf] Text
RAMA_22201_03011281621049_0001076005_0004018001_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (5MB)
[thumbnail of RAMA_22201_03011281621049_0001076005_0004018001_02.pdf] Text
RAMA_22201_03011281621049_0001076005_0004018001_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_22201_03011281621049_0001076005_0004018001_03.pdf] Text
RAMA_22201_03011281621049_0001076005_0004018001_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_22201_03011281621049_0001076005_0004018001_04.pdf] Text
RAMA_22201_03011281621049_0001076005_0004018001_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_22201_03011281621049_0001076005_0004018001_05.pdf] Text
RAMA_22201_03011281621049_0001076005_0004018001_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_22201_03011281621049_0001076005_0004018001_06.pdf] Text
RAMA_22201_03011281621049_0001076005_0004018001_06.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (70kB) | Request a copy
[thumbnail of RAMA_22201_03011281621049_0001076005_0004018001_07_ref.pdf] Text
RAMA_22201_03011281621049_0001076005_0004018001_07_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (67kB) | Request a copy
[thumbnail of RAMA_22201_03011281621049_0001076005_0004018001_08_lamp.pdf] Text
RAMA_22201_03011281621049_0001076005_0004018001_08_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (22MB) | Request a copy

Abstract

Guna untuk mempercepat pembangunan pada kawasan wilayah Seberang Ulu, Pemerintah Provinsi Sumatera Selatan akan membangun Komplek Perkantoran Terpadu daerah Keramasan yang meliputi pembangunan kolam retensi seluas 7,5 ha. Salah satu komponen penting pengendalian biaya proyek kontruksi adalah pengaturan keuangan yang sesuai perencanaan. Berdasarkan hal tersebut, maka penulis telah melakukan penelitian perhitungan Rencana Anggara Biaya (RAB) Pembangunan tempat tersebut dengan berfokus pada (1) Estimasi biaya pekerjaan pembangunan kolam retensi pada Komplek Perkantoran Terpadu Keramasan – Kota Palembang, (2) Perbedaan volume pekerjaan galian di lapangan dan perhitungan ulang sesuai dengan gambar rencana, (3) Perbedaan anggaran biaya perhitungan dan realisasinya. Berdasarkan hasil perhitungan, dapat disimpulkan bahwa; (1) Estimasi RAB komplek tersebut adalah sebesar Rp 37.586.331.207,57. (2) Selisih volume pekerjaan galian di lapangan dan perhitungan ulang menggunakan gambar rencana adalah sebesar 15.191,26 m3. (3) Total biaya anggaran realisasi masih memiliki surplus Rp. 1.237.128.832,04 dibandingkan dengan rencana anggaran perhitungan.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Rencana Anggaran Biaya(RAB), Kolam Retensi, Galian
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: M Ilham Syahputra
Date Deposited: 09 Mar 2023 06:44
Last Modified: 09 Mar 2023 07:01
URI: http://repository.unsri.ac.id/id/eprint/90424

Actions (login required)

View Item View Item