PERENCANAAN MANAJEMEN STOCKPILE BATUBARA DI PT. MUARA ALAM SEJAHTERA DI TANJUNG BARU, PALEMBANG, SUMATERA SELATAN

KURNIAWAN, M. TANDRY and Ningsih, RR. Yunita Bayu (2018) PERENCANAAN MANAJEMEN STOCKPILE BATUBARA DI PT. MUARA ALAM SEJAHTERA DI TANJUNG BARU, PALEMBANG, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201 _03021281320016.pdf] Text
RAMA_31201 _03021281320016.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (974kB) | Request a copy
[thumbnail of RAMA_31201 _03021381419125_0023037813_01_front_ref.pdf]
Preview
Text
RAMA_31201 _03021381419125_0023037813_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (278kB) | Preview
[thumbnail of RAMA_31201 _03021381419125_0023037813_02.pdf] Text
RAMA_31201 _03021381419125_0023037813_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (190kB) | Request a copy
[thumbnail of RAMA_31201 _03021381419125_0023037813_03.pdf] Text
RAMA_31201 _03021381419125_0023037813_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (197kB) | Request a copy
[thumbnail of RAMA_31201 _03021381419125_0023037813_04.pdf] Text
RAMA_31201 _03021381419125_0023037813_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (314kB) | Request a copy
[thumbnail of RAMA_31201 _03021381419125_0023037813_05.pdf] Text
RAMA_31201 _03021381419125_0023037813_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (131kB) | Request a copy
[thumbnail of RAMA_31201 _03021381419125_0023037813_06_ref.pdf] Text
RAMA_31201 _03021381419125_0023037813_06_ref.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (131kB) | Request a copy
[thumbnail of RAMA_31201 _03021381419125_0023037813_07_lamp.pdf] Text
RAMA_31201 _03021381419125_0023037813_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (500kB) | Request a copy

Abstract

PT. Muara Alam Sejahtera is a child company under the company called Baramulti which engaged in coal mining industry, having a mine located at Lahat, Sumatera Selatan. PT. Muara Alam Sejahtera made a work contract with PT. Kereta Api Indonesia for transportation of the coal to the dock. The dock then later will be used as temporary stockpile, before the coal can be sent to the buyer. For a stockpile to work well, good management system is needed. Planning of management system need to calculate couple of factors like, location condition, production target and also quantity and quality of the coal. The management system that will be used is called FiFo (First in First out). FiFo is a system which the first product to enter, is the first product to be taken out. With the help of heavy machinery like wheel loader, excavator backhoe, dump truck, and barge loading conveyor, also facility like work office, electricity, water and human resources, hopefully will able to support stockpile performance.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Stockpile, Manajemen, Produksi
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Mr Halim Sobri
Date Deposited: 01 Oct 2019 03:22
Last Modified: 01 Oct 2019 03:22
URI: http://repository.unsri.ac.id/id/eprint/9801

Actions (login required)

View Item View Item