ANALISIS KELAYAKAN NILAI INVESTASI KONTRAK KERJA BUILD OPERATE TRANSFER (Studi Kasus Proyek Revitalisasi Kawasan GOR Palembang)

FEBRIKA, DIAN and Juliantina, Ika (2011) ANALISIS KELAYAKAN NILAI INVESTASI KONTRAK KERJA BUILD OPERATE TRANSFER (Studi Kasus Proyek Revitalisasi Kawasan GOR Palembang). Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03061001018.pdf] Text
RAMA_22201_03061001018.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (41MB) | Request a copy
[thumbnail of RAMA_22201_03061001018_0001076005_01_front_ref.pdf] Text
RAMA_22201_03061001018_0001076005_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (6MB)
[thumbnail of RAMA_22201_03061001018_0001076005_02.pdf] Text
RAMA_22201_03061001018_0001076005_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (9MB) | Request a copy
[thumbnail of RAMA_22201_03061001018_0001076005_03.pdf] Text
RAMA_22201_03061001018_0001076005_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_22201_03061001018_0001076005_04.pdf] Text
RAMA_22201_03061001018_0001076005_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (18MB) | Request a copy
[thumbnail of RAMA_22201_03061001018_0001076005_05.pdf] Text
RAMA_22201_03061001018_0001076005_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (432kB) | Request a copy
[thumbnail of RAMA_22201_03061001018_0001076005_06_ref.pdf] Text
RAMA_22201_03061001018_0001076005_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (565kB) | Request a copy
[thumbnail of RAMA_22201_03061001018_0001076005_07_lamp.pdf] Text
RAMA_22201_03061001018_0001076005_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy

Abstract

One program that will be realized by the provincial govemment of South Sumatra, South Sumatra election in order to host the SEA Games XXVI on 2011 namely revitalization of Campus Sport Building of Palembang. Government in collaboration with the private sector to revitalize the area into Palembang Sport and Convention Center (PSCC), hotel and town square. This partnership uses a system of Build Operate Transfer (BOT) during the period of 28 years. Feasibility study reviewed the financial aspects need to be conducted to determine the BOT project is feasible or not to be implemented. The purpose of this study is to find description of Build Operate Transfer and provides an altemative feasibility study to determine the financial aspect was appropriate or not BOT system in terms of govemment and investors. The method used in this research is through the analysis of Net Present Value (NPV), Internal Rate of Retum (IRR) and Payback Period (PP). Data required to support this research derived from relevant agencies ie departement of PU Cipta Karya of South Sumatra Province. Financial analysis of contract of B.O.T at interest rate level of 15% per year its obtained Net Present Value (NPV) = + Rp.38.596.602.241,79, value of IRR was equal to 18,34% and investment payback period is 13,28 years during which period investment of 28 years. Because the NPV i s positive, the IRR value is greater than value at interest rate level of 15% per year and repayment period not exceeding the time limit of investment, thus the investment project is feasible.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Build Operate Transfer, Feasibility Study, Financial Aspect
Subjects: T Technology > TH Building construction > TH5011-5701 Construction by phase of the work (Building trades)
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Mrs Furika Furika
Date Deposited: 02 May 2023 06:49
Last Modified: 02 May 2023 06:49
URI: http://repository.unsri.ac.id/id/eprint/98820

Actions (login required)

View Item View Item