EVALUASI SISTEM PENIRISAN TAMBANG DI PIT 1 BARAT BANGKO BARAT PT. BUKIT ASAM (PERSERO), TBK UNIT PENAMBANGAN TANJUNG ENIM, SUMATERA SELATAN

KURNIAWAN, ARIE and Asof, Marwan and Mukiat, Mukiat (2016) EVALUASI SISTEM PENIRISAN TAMBANG DI PIT 1 BARAT BANGKO BARAT PT. BUKIT ASAM (PERSERO), TBK UNIT PENAMBANGAN TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03111002081_0011115805_0022115801_01_front_ref.pdf]
Preview
Text
RAMA_31201_03111002081_0011115805_0022115801_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (829kB) | Preview
[thumbnail of RAMA_31201_03111002081_0011115805_0022115801_02.pdf] Text
RAMA_31201_03111002081_0011115805_0022115801_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (378kB) | Request a copy
[thumbnail of RAMA_31201_03111002081_0011115805_0022115801_03.pdf] Text
RAMA_31201_03111002081_0011115805_0022115801_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (609kB) | Request a copy
[thumbnail of RAMA_31201_03111002081_0011115805_0022115801_04.pdf] Text
RAMA_31201_03111002081_0011115805_0022115801_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (708kB) | Request a copy
[thumbnail of RAMA_31201_03111002081_0011115805_0022115801_05.pdf] Text
RAMA_31201_03111002081_0011115805_0022115801_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13kB) | Request a copy
[thumbnail of RAMA_31201_03111002081_0011115805_0022115801_06_ref.pdf] Text
RAMA_31201_03111002081_0011115805_0022115801_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8kB) | Request a copy
[thumbnail of RAMA_31201_03111002081_0011115805_0022115801_07_lamp.pdf] Text
RAMA_31201_03111002081_0011115805_0022115801_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (815kB) | Request a copy

Abstract

Mine drainage can’t be separated part of mine operation. If mine drainage is not implemented well, mine operation will be interfered. At PT. Bukit Asam (Persero), Tbk, mine drainage system is done by flowing the run off water in mine pit which has been collected in sump and pumping it out of the pit. Catchment area at Pit 1 Barat Bangko Barat front mine is 70,76 Ha. The sump in Pit 1 is located at 24 mAsl. Pumping system at Pit 1 is using 3 385kwh Sulzer pump which is connected by 324 meters High Density Polyethylene (HDPE) pipeline to the settling pond. Based on field research, the actual pump discharge from each line is 10,7m3/minute meanwhile the pump specification is 14 m3/minute. From the calculation, the pump supply is sufficient but the operation time of the pump is not optimal. Research shows that target pump production is not fulfilled yet, it can be seen that there is water which is still flooding the mine front. The problem can be solved by optimzing the pumps work schedule and substituting the pipe which appropriate with the pump specification, and pump-pipe lines maintenance periodically.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Mine Drainage, Pump, Piping System, Pipe Optimise
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 2701 not found.
Date Deposited: 12 Nov 2019 15:44
Last Modified: 12 Nov 2019 15:44
URI: http://repository.unsri.ac.id/id/eprint/15554

Actions (login required)

View Item View Item