ANALISIS EFEKTIVITAS DAN EFISIENSI ALAT GALI MUAT DAN ALAT ANGKUT DENGAN METODE RIPPING DAN BLASTING DIKAITKAN DENGAN BIAYA PENGUPASAN TANAH PENUTUP DI PT. SATRIA BAHANA SARANA TANJUNG ENIM, SUMATERA SELATAN

YUDISTIRA, RANGGA and Arahman, Arahman and Bochori, Bochori (2019) ANALISIS EFEKTIVITAS DAN EFISIENSI ALAT GALI MUAT DAN ALAT ANGKUT DENGAN METODE RIPPING DAN BLASTING DIKAITKAN DENGAN BIAYA PENGUPASAN TANAH PENUTUP DI PT. SATRIA BAHANA SARANA TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381419147.pdf] Text
RAMA_31201_03021381419147.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021381419147_TURNITIN.pdf] Text
RAMA_31201_03021381419147_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (22MB) | Request a copy
[thumbnail of RAMA_31201_03021381419147_0027035604_0025107401_01_front_ref.pdf] Text
RAMA_31201_03021381419147_0027035604_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (352kB)
[thumbnail of RAMA_31201_03021381419147_0027035604_0025107401_02.pdf] Text
RAMA_31201_03021381419147_0027035604_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (358kB) | Request a copy
[thumbnail of RAMA_31201_03021381419147_0027035604_0025107401_03.pdf] Text
RAMA_31201_03021381419147_0027035604_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (117kB) | Request a copy
[thumbnail of RAMA_31201_03021381419147_0027035604_0025107401_04.pdf] Text
RAMA_31201_03021381419147_0027035604_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (154kB) | Request a copy
[thumbnail of RAMA_31201_03021381419147_0027035604_0025107401_05.pdf] Text
RAMA_31201_03021381419147_0027035604_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11kB) | Request a copy
[thumbnail of RAMA_31201_03021381419147_0027035604_0025107401_06_ref.pdf] Text
RAMA_31201_03021381419147_0027035604_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (122kB) | Request a copy
[thumbnail of RAMA_31201_03021381419147_0027035604_0025107401_07_lamp.pdf] Text
RAMA_31201_03021381419147_0027035604_0025107401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (859kB) | Request a copy

Abstract

PT. Satria Bahana Sarana is a mining contractor company that works in the mining location of PT. Bukit Asam Tbk with a mining business permit covering an area of ​​4500 Ha, which began operating in March 2015 with an operating area in West Banko. Overburden stripping activity in pit 1 North Banko Barat PTBA by ripping and blasting methods. The overburden stripping operation uses the ripping method to feed the material but there are certain types of material with hardness that cannot be worked productively by the ripper on the bulldozer in providing the material, so the blasting process is carried out to support the productivity of the digging and hauling tools. The calculation of overburden stripping consists of technical and economic aspects. Technical aspects include the calculation of productivity of komatsu D 375 A bulldozer digging equipment, komatsu PC 2000 excavator loading dug, and HD 785 dump truck hauling equipment using the ripping and blasting method, while the economic aspects include the cost of overburden stripping using the ripping and blasting method. The results of the analysis of the D 375 A komatsu bulldozer digging equipment, the komatsu PC 2000 excavator loading dug, and the HD 785 komatsu dump truck conveyance as follows: Technical aspects of productivity of the loading and unloading digging equipment and ripping method, namely the excavator loaded with komatsu PC 2000 excavator , 20 bcm / hour (1 unit) and HD 785 komatsu dump truck conveyance at 55.08 bcm / hour (1 unit) or 440.64 bcm / hour (8 units), while the komatsu PC 2000 excavator dump excavator blasting method 707.55 bcm / hour (1 unit) and HD 785 komatsu dump truck transport equipment at 61.56 bcm / hour (1 unit) or 492.48 bcm / hour (8 units). The economical aspect of the total cost of overburden ripping method (Rp. 25,353 / bcm) is more expensive than the total cost of overburden over method of blasting (Rp. 19,606 / bcm). Keywords: Productivity, ripping and blasting methods, Cost Analysis.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Produktivitas, metode ripping dan blasting, Analisis Biaya
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 875 not found.
Date Deposited: 06 Aug 2019 02:08
Last Modified: 06 Aug 2019 02:08
URI: http://repository.unsri.ac.id/id/eprint/2281

Actions (login required)

View Item View Item