ANALISIS RISIKO DAN POTENSI BAHAYA MENGGUNAKAN METODE HAZOPS (HAZARD AND OPERABILITY STUDY) PADA PEKERJAAN PEMELIHARAAN RUTIN TRAFO DAYA PT.PLN (PERSERO) UNIT PELAKSANA TRANSMISI BOGOR

RAHMAT, KHALISHAH DWI FAJARINI and Andarini, Desheila (2019) ANALISIS RISIKO DAN POTENSI BAHAYA MENGGUNAKAN METODE HAZOPS (HAZARD AND OPERABILITY STUDY) PADA PEKERJAAN PEMELIHARAAN RUTIN TRAFO DAYA PT.PLN (PERSERO) UNIT PELAKSANA TRANSMISI BOGOR. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_13201_10011281520214.pdf] Text
RAMA_13201_10011281520214.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (24MB) | Request a copy
[thumbnail of RAMA_13201_10011281520214_TURNITIN.pdf] Text
RAMA_13201_10011281520214_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (26MB) | Request a copy
[thumbnail of RAMA_13201_10011281520214_8856630017_01_front_ref.pdf]
Preview
Text
RAMA_13201_10011281520214_8856630017_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Preview
[thumbnail of RAMA_13201_10011241520214_8856630017_02.pdf] Text
RAMA_13201_10011241520214_8856630017_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (560kB) | Request a copy
[thumbnail of RAMA_13201_10011281520214_8856630017_03.pdf] Text
RAMA_13201_10011281520214_8856630017_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (172kB) | Request a copy
[thumbnail of RAMA_13201_10011281520214_8856630017_04.pdf] Text
RAMA_13201_10011281520214_8856630017_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (100kB) | Request a copy
[thumbnail of RAMA_13201_10011281520214_8856630017_05.pdf] Text
RAMA_13201_10011281520214_8856630017_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (248kB) | Request a copy
[thumbnail of RAMA_13201_10011281520214_8856630017_06.pdf] Text
RAMA_13201_10011281520214_8856630017_06.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (123kB) | Request a copy
[thumbnail of RAMA_13201_10011281520214_8856630017_07.pdf] Text
RAMA_13201_10011281520214_8856630017_07.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (95kB) | Request a copy
[thumbnail of RAMA_13201_10011281520214_88566300017_06_ref.pdf] Text
RAMA_13201_10011281520214_88566300017_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (90kB) | Request a copy
[thumbnail of RAMA_13201_10011281520214_8856630017_07_lamp.pdf] Text
RAMA_13201_10011281520214_8856630017_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13MB) | Request a copy

Abstract

Equipment that is use in substation, contains some hazard that are related to high voltage electricity, when it comes to routine maintenance tasks, worker are required to work on height, such as climbing on top of power transformer, which causes falling from heights and also being electrocuted. For this reason, risk and potential hazard needed to be done on power transformer routine maintenance. This research aims to identify risk and potential hazard using HAZOPS method on power transformer routine maintenance in PT.PLN (Persero) Transmission Implementation Unit Bogor. This research is using descriptive study with qualitative approach. Data collecting instruments use is interview guidelines, observation paper and HAZOPS worksheets. Sampling technique is using purposive random sampling then as the result determined that the source of information are 3 key informants and 3 informants. The obtained data then being analyzed descriptively and compared with standard that used, which is MIL-STD-882D standard. The results of the study show the identified hazards based on the stages of work are time, action, step, organization, etc. The risk analysis carried out showed that there was a combined total of 9 hazards found, risk ranking showed that there were 2 high risks, 2 serious risks, 1 medium risk and 4 low risks.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Hazard and Operability Study, Pemeliharaan rutin, Manajemen Risiko
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions: 10-Faculty of Public Health > 13201-Public Health (S1)
Depositing User: Users 792 not found.
Date Deposited: 09 Aug 2019 01:50
Last Modified: 09 Aug 2019 01:50
URI: http://repository.unsri.ac.id/id/eprint/3181

Actions (login required)

View Item View Item