REDESAIN RANCANGAN ULTIMATE PIT LIMIT BERDASARKAN PERUBAHAN HARGA BATUBARA MENGGUNAKAN APLIKASI MINESCAPE 5.7 DI PIT ABIMANYU PT. PUTRA MUBA COAL, KECAMATAN SUNGAI LILIN, KABUPATEN MUSI BANYUASIN, PROVINSI SUMATERA SELATAN

KURNIAWAN, ROBY and Ibrahim, Eddy and Komar, Syamsul (2022) REDESAIN RANCANGAN ULTIMATE PIT LIMIT BERDASARKAN PERUBAHAN HARGA BATUBARA MENGGUNAKAN APLIKASI MINESCAPE 5.7 DI PIT ABIMANYU PT. PUTRA MUBA COAL, KECAMATAN SUNGAI LILIN, KABUPATEN MUSI BANYUASIN, PROVINSI SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281823113.pdf] Text
RAMA_31201_03021281823113.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021281823113_TURNITIN.pdf] Text
RAMA_31201_03021281823113_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021281823113_ 0022116203_ 9990087012_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281823113_ 0022116203_ 9990087012_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (869kB) | Preview
[thumbnail of RAMA_31201_03021281823113_ 0022116203_ 9990087012_02.pdf] Text
RAMA_31201_03021281823113_ 0022116203_ 9990087012_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (798kB) | Request a copy
[thumbnail of RAMA_31201_03021281823113_ 0022116203_ 9990087012_03.pdf] Text
RAMA_31201_03021281823113_ 0022116203_ 9990087012_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (778kB) | Request a copy
[thumbnail of RAMA_31201_03021281823113_ 0022116203_ 9990087012_04.pdf] Text
RAMA_31201_03021281823113_ 0022116203_ 9990087012_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021281823113_ 0022116203_ 9990087012_05.pdf] Text
RAMA_31201_03021281823113_ 0022116203_ 9990087012_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (194kB) | Request a copy
[thumbnail of RAMA_31201_03021281823113_ 0022116203_ 9990087012_06_ref.pdf] Text
RAMA_31201_03021281823113_ 0022116203_ 9990087012_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (296kB) | Request a copy
[thumbnail of RAMA_31201_03021281823113_ 0022116203_ 9990087012_07_lamp.pdf] Text
RAMA_31201_03021281823113_ 0022116203_ 9990087012_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (776kB) | Request a copy

Abstract

The Abimanyu pit is one of the pits located at PT. Putra Muba Coal had stopped mining in 2018 due to a significant decline in coal prices at that time so the mining process could not continue. In 2022, the movement of coal prices has increased again so that it is necessary to re-design the ultimate pit limit on the SR in accordance with the selling price so that the company has an alternative ultimate pit in several SR scenarios, namely 1.4; 1,2; and 0.7. Based on geotechnical recommendations from PT. PMC, the geometry of the planned single slope is a height of 6 meters, 45° for single slope, and the width of the slope is 3 meters with an overall slope of 32°. The results of the calculation of the mined reserves for the SR 1.4 pit design are 2,405,489.05 Tons of Coal and 3,414,776.02 Bcm Overburden and have a total area of 16.59 Ha with the maximum pit limit depth at an elevation of 38 meters below ground level. In the SR 1.2 pit design, the mined reserves are 2,304,319.35 Tons of Coal and 2,847,674.30 Bcm Overburden and have a total area of 15.85 Ha with the maximum pit limit depth at an elevation of 36 meters below ground level. . In the SR 0.7 pit design, the mined reserves are 1,356,484.07 Tons of Coal and 1,015,260.50 Bcm of Overburden and have a total area of 9.99 Ha with the maximum pit limit depth at an elevation of 24 meters below ground level.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: pit limit, stripping ratio, lereng tunggal, dan cadangan
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Roby Kurniawan
Date Deposited: 18 Aug 2022 04:18
Last Modified: 18 Aug 2022 04:18
URI: http://repository.unsri.ac.id/id/eprint/77408

Actions (login required)

View Item View Item