EVALUASI REALISASI PENAMBANGAN BERDASARKAN MINE PLAN DESIGN MENGGUNAKAN APLIKASI MINESCAPE 5.7 BULAN JANUARI 2022 DI PIT PANDU PT PUTRA MUBA COAL, KABUPATEN MUSI BANYUASIN, SUMATERA SELATAN

KURNIAWAN, DHANDY and Ibrahim, Eddy and Syarifudin, Syarifudin (2022) EVALUASI REALISASI PENAMBANGAN BERDASARKAN MINE PLAN DESIGN MENGGUNAKAN APLIKASI MINESCAPE 5.7 BULAN JANUARI 2022 DI PIT PANDU PT PUTRA MUBA COAL, KABUPATEN MUSI BANYUASIN, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181823005.pdf] Text
RAMA_31201_03021181823005.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021181823005_TURNITIN.pdf] Text
RAMA_31201_03021181823005_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy
[thumbnail of RAMA_31201_03021181823005_ 0022116203_ 0004097401_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181823005_ 0022116203_ 0004097401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (359kB) | Preview
[thumbnail of RAMA_31201_03021181823005_ 0022116203_ 0004097401_02.pdf] Text
RAMA_31201_03021181823005_ 0022116203_ 0004097401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (332kB) | Request a copy
[thumbnail of RAMA_31201_03021181823005_ 0022116203_ 0004097401_03.pdf] Text
RAMA_31201_03021181823005_ 0022116203_ 0004097401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (241kB) | Request a copy
[thumbnail of RAMA_31201_03021181823005_ 0022116203_ 0004097401_04.pdf] Text
RAMA_31201_03021181823005_ 0022116203_ 0004097401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021181823005_ 0022116203_ 0004097401_05.pdf] Text
RAMA_31201_03021181823005_ 0022116203_ 0004097401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (35kB) | Request a copy
[thumbnail of RAMA_31201_03021181823005_ 0022116203_ 0004097401_06_ref.pdf] Text
RAMA_31201_03021181823005_ 0022116203_ 0004097401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (155kB) | Request a copy
[thumbnail of RAMA_31201_03021181823005_ 0022116203_ 0004097401_07_lamp.pdf] Text
RAMA_31201_03021181823005_ 0022116203_ 0004097401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT. Putra Muba Coal is one of the national companies engaged in the coal mining industry and has been meeting coal needs for various local industries and international markets since 2008. With the aim of maximizing the amount of coal reserves owned by PT. Putra Muba Coal, then a mining plan was made to ensure that the mining activities carried out can be well coordinated so that they are in accordance with the production targets to be achieved. However, from the mining results, there is an inaccuracy between the plan and the realization in the field. This study aims to analyze the achievement of the mining plan against the realization in the field, its causal factors, impacts, and the efforts that can be made so that the mining plan can be realized based on the mine plan design. The data needed in the research are sequence maps, progress, and schema and quality data. Data processing using the Minescape application. In the realization, the actual production achievement in January 2022 Pit Pandu PT Putra Muba Coal amounted to 72.16% from 593,889 BCM, namely 428,536.44 BCM for overburden and 56.62% from 260,469.7 tons, namely 147,488.40 tons. The causes of non-achievement are Effective Working Hours (EWH) which are smaller than planned, lower productivity than planned and lack of supervision. This failure will affect the stripping ratio value and increase production costs for mining activities in the following month. The solution that can be used to overcome this unattainable is the addition of a loss time indicator in the monthly report as an effort to increase EWH and increase supervision.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Ketidaktercapaian, realisasi, sekuen
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Dhandy Kurniawan
Date Deposited: 19 Aug 2022 04:58
Last Modified: 19 Aug 2022 04:58
URI: http://repository.unsri.ac.id/id/eprint/77488

Actions (login required)

View Item View Item