PERENCANAAN TEKNIS DAN EKONOMIS REKLAMASI TAMBANG BATUBARA TAHUN 2023-2024 PT. TRIARYANI KABUPATEN MUSI RAWAS UTARA, PROVINSI SUMATERA SELATAN

LISVINIA, LISVINIA and Hasjim, Machmud and Amin, Muhammad (2022) PERENCANAAN TEKNIS DAN EKONOMIS REKLAMASI TAMBANG BATUBARA TAHUN 2023-2024 PT. TRIARYANI KABUPATEN MUSI RAWAS UTARA, PROVINSI SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181823001.pdf] Text
RAMA_31201_03021181823001.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021181823001_8871510016_0018085815_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181823001_8871510016_0018085815_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (444kB) | Preview
[thumbnail of RAMA_31201_03021181823001_8871510016_0018085815_02.pdf] Text
RAMA_31201_03021181823001_8871510016_0018085815_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (229kB) | Request a copy
[thumbnail of RAMA_31201_03021181823001_8871510016_0018085815_03.pdf] Text
RAMA_31201_03021181823001_8871510016_0018085815_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (567kB) | Request a copy
[thumbnail of RAMA_31201_03021181823001_8871510016_0018085815_04.pdf] Text
RAMA_31201_03021181823001_8871510016_0018085815_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (167kB) | Request a copy
[thumbnail of RAMA_31201_03021181823001_8871510016_0018085815_05.pdf] Text
RAMA_31201_03021181823001_8871510016_0018085815_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (30kB) | Request a copy
[thumbnail of RAMA_31201_03021181823001_8871510016_0018085815_06_ref.pdf] Text
RAMA_31201_03021181823001_8871510016_0018085815_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (93kB) | Request a copy
[thumbnail of RAMA_31201_03021181823001_8871510016_0018085815_07_lamp.pdf] Text
RAMA_31201_03021181823001_8871510016_0018085815_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021181823001_TURNITIN.pdf] Text
RAMA_31201_03021181823001_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy

Abstract

PT Triaryani (TRA) is located in Musi Rawas Utara, South Sumatra. TRA produces 1,000,000. tons in 2019. The plan for topsoil spreading with an area of 1.15 hectares which will be reclaimed in 2023 requires 5,750 m3 of topsoil, while in 2024 it requires topsoil with anPerPer area of 6.6 hectares as much as 33,000m3 with a topsoil thickness of 0 ,5 m. The revegetation activity plan covers an area of 1.15 hectares by planting teak and jungle plants. The number of teak plants that will be planted is 1278 plants, while in 2024 with an area of 6.6 hectares planted as many as 6,056 plants with a spacing of 3 x 3 m. The need for mechanical equipment in topsoil spreading activities is 1 unit of digging tool - load backhoes, 2 units of dumptruck, 1 unit of bulldozers D85ESS – 1.The costs required for mine reclamation activities in 2023 with an area of 1.15 hectares consist of direct costs of Rp. 260,548,595 and indirect costs of Rp. 54,454,656. The total cost of reclamation in the production operation stage is Rp. 315.003.251. Meanwhile, the costs required for mine reclamation activities in 2024 with an area of 6.6 hectares consist of direct costs of Rp. 1,493,883,791 and indirect costs of Rp. 312.221.712 The total cost of reclamation for the production operation stage is Rp. 1,806,105,503

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Reklamasi,Perencanaan ,Teknis,Ekonomis
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Lisvinia Lisvinia
Date Deposited: 16 Nov 2022 07:25
Last Modified: 14 Feb 2023 02:22
URI: http://repository.unsri.ac.id/id/eprint/82095

Actions (login required)

View Item View Item