EVALUASI KEBUTUHAN ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MEMENUHI TARGET PRODUKSI BATUBARA SEBESAR 4.000.000 TON/TAHUN DI PT. PUTRA MUBA COAL, KABUPATEN MUSI BANYUASIN, PROVINSI SUMATERA SELATAN

ABRAHAM, WAYOI and Mukiat, Mukiat and Cahyaningsih, Bimbi (2023) EVALUASI KEBUTUHAN ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MEMENUHI TARGET PRODUKSI BATUBARA SEBESAR 4.000.000 TON/TAHUN DI PT. PUTRA MUBA COAL, KABUPATEN MUSI BANYUASIN, PROVINSI SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021981722130.pdf] Text
RAMA_31201_03021981722130.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021981722130_TURNITIN.pdf] Text
RAMA_31201_03021981722130_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_31201_03021981722130_0022115801_0205069201_01_front_ref.pdf] Text
RAMA_31201_03021981722130_0022115801_0205069201_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (297kB)
[thumbnail of RAMA_31201_03021981722130_0022115801_0205069201_02.pdf] Text
RAMA_31201_03021981722130_0022115801_0205069201_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (449kB) | Request a copy
[thumbnail of RAMA_31201_03021981722130_0022115801_0205069201_03.pdf] Text
RAMA_31201_03021981722130_0022115801_0205069201_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (337kB) | Request a copy
[thumbnail of RAMA_31201_03021981722130_0022115801_0205069201_04.pdf] Text
RAMA_31201_03021981722130_0022115801_0205069201_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (305kB) | Request a copy
[thumbnail of RAMA_31201_03021981722130_0022115801_0205069201_05.pdf] Text
RAMA_31201_03021981722130_0022115801_0205069201_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (32kB) | Request a copy
[thumbnail of RAMA_31201_03021981722130_0022115801_0205069201_06_ref.pdf] Text
RAMA_31201_03021981722130_0022115801_0205069201_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (31kB) | Request a copy
[thumbnail of RAMA_31201_03021981722130_0022115801_0205069201_07_lamp.pdf] Text
RAMA_31201_03021981722130_0022115801_0205069201_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (935kB) | Request a copy

Abstract

PT. Putra Muba Coal is a national company engaged in the coal mining industry and has been meeting coal needs for various local industries and international markets since 2008. PT. Putra Muba Coal uses an open pit mining system using a combination of excavators and dump trucks. In 2022 based on the RKAB (Work Plan and Budget) which has been approved by the Ministry of ESDM, PT. Putra Muba Coal has increased its coal production target to meet market demand of 4,000,000 tons/year, by operating in 1 pit, namely the pilot pit. In connection with the plan to achieve coal production, it is necessary to plan the types and amount of mechanical equipment to be used, such as excavators and dump trucks. Based on the results of actual calculations in the field on the pilot pit with the tools used, namely 2 excavators and 16 dumptrucks, the production of loading and unloading equipment was obtained, namely 2,771,077 tons/year and the production of hauling equipment, namely 1,829,733 tons/year. Due to the increase in the 2022 production target and the actual results obtained, it is necessary to hold a plan for adding equipment so that the production target can be achieved. Therefore, a report was prepared in the form of an Evaluation of the Needs for Digging Equipment and Transport Equipment to meet the Coal Production target of 4,000,000 tons/year at PT Putra Muba Coal, so that it can be used as material for consideration for the plan to add the loading and unloading equipment. Keywords: Production target improvement, tool plan.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Production target improvement, tool plan.
Subjects: T Technology > T Technology (General) > T1-995 Technology (General)
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Abraham A. L. Wayoi
Date Deposited: 28 Mar 2023 04:53
Last Modified: 28 Mar 2023 04:53
URI: http://repository.unsri.ac.id/id/eprint/91745

Actions (login required)

View Item View Item