Items where Author is "Aidi, M. Nizom"

Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 8.

Thesis

SAPUTRA, RENDY and Aidi, M. Nizom (2007) PREDIKSI JARINGAN PIPA DISTRIBUSI AIR BERSIH DI KELURAHAN TANGGA TAKAT KOTA PALEMBANG TAHUN 2017. Undergraduate thesis, Sriwijaya University.

MUKLISSUSANTO, MUKLISSUSANTO and Aidi, M. Nizom (2007) EVALUASI JARINGAN DRAINASE DAN PEMBUATAN KOLAM RETENSI PADA PROYEK PEMBANGUNAN INFRASTRUKTUR GEDUNG KANTOR PEMERINTAH KOTA PRABUMULIH. Undergraduate thesis, Sriwijaya University.

MEGAWITA, RIYAN and Adinegara, Subary and Aidi, M. Nizom (2006) KAJIAN KUALITAS DAN KUANTITAS FISIK SEDIMENTASI AIR SUNGAI LEMATANG UNTUK AIR BAKU DI DESA MUARA NIRU KECAMATAN GUNUNG MEGANG MUARA ENIM. Undergraduate thesis, Sriwijaya University.

WAHYUNI, MSY. EVA and Aidi, M. Nizom and Adinegara, Subary (2006) ANALISA PERHITUNGAN SISTEM JARINGAN DISTRIBUSI PENYEDIAAN AIR BERSIH PADA KELURAHAN 8 ILIR PALEMBANG TAHUN 2015. Undergraduate thesis, Sriwijaya University.

ISKANDAR, DUDI and Aidi, M. Nizom (2006) ANALISIS SEDIMENTASI PADA INSTALASI PENGOLAHAN AIR BERSIH (STUDI KASUS INSTALASI PENGOLAHAN AIR BERSIH KARANG ANYAR PDAM TIRTA MUSI PALEMBANG). Undergraduate thesis, Sriwijaya University.

NASUTION, ZAKARIA and Adinegara, Subary and Aidi, M. Nizom (2006) PERENCANAAN JARINGAN DISTRIBUSI PIPA AIR BERSIH PADA KOMPLEK PERUMAHAN SELAYUR JAYA PALEMBANG. Undergraduate thesis, Sriwijaya University.

SILITONGA, DANK SAGEN and Aidi, M. Nizom and Lussetyowati, Tutur (2005) ANALISA PENGENDALIAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE CRITICAL PATH METHOD (STUDI KASUS PADA PROYEK PEMBANGUNAN PABRIK OBAT CEPHALOSPORIN PT. DEXA MEDICA PALEMBANG). Undergraduate thesis, Sriwijaya University.

IRAWAN, YUDI and Aidi, M. Nizom (2005) PERENCANAAN KONSTRUKSI JETTY SEBAGAI ALTERNATIF PENGAMANAN MUARA SUNGAI (STUDI KASUS MUARA SUNGAI AIR BENGKULU). Undergraduate thesis, Sriwijaya University.

This list was generated on Sun Dec 22 03:26:11 2024 WIB.