KAJIAN TEKNIS PENGURANGAN WAKTU SLIPPERY PADA JALAN ANGKUT OVERBURDEN PIT. ELANG PT. ULIMA NITRA JOBSITE MME DARMO, MUARA ENIM, SUMATERA SELATAN

SAPUTRA, YOLAND and Toha, M. Taufik and Pebrianto, Rosihan (2023) KAJIAN TEKNIS PENGURANGAN WAKTU SLIPPERY PADA JALAN ANGKUT OVERBURDEN PIT. ELANG PT. ULIMA NITRA JOBSITE MME DARMO, MUARA ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381621091.pdf] Text
RAMA_31201_03021381621091.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021381621091_TURNITIN.pdf] Text
RAMA_31201_03021381621091_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021381621091_8864000016_0010029003_01_front_ref.pdf] Text
RAMA_31201_03021381621091_8864000016_0010029003_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (624kB)
[thumbnail of RAMA_31201_ 03021381621091_8864000016_0010029003_02.pdf] Text
RAMA_31201_ 03021381621091_8864000016_0010029003_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (199kB) | Request a copy
[thumbnail of RAMA_31201_03021381621091_8864000016_0010029003_03.docx.pdf] Text
RAMA_31201_03021381621091_8864000016_0010029003_03.docx.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (135kB) | Request a copy
[thumbnail of RAMA_31201_03021381621091_8864000016_0010029003_04.docx.pdf] Text
RAMA_31201_03021381621091_8864000016_0010029003_04.docx.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (141kB) | Request a copy
[thumbnail of RAMA_31201_03021381621091_8864000016_0010029003_05.docx.pdf] Text
RAMA_31201_03021381621091_8864000016_0010029003_05.docx.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (36kB) | Request a copy
[thumbnail of RAMA_31201_03021381621091_8864000016_0010029003_06_ref.docx.pdf] Text
RAMA_31201_03021381621091_8864000016_0010029003_06_ref.docx.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (68kB) | Request a copy
[thumbnail of RAMA_31201_03021381621091_8864000016_0010029003_07_lamp.docx.pdf] Text
RAMA_31201_03021381621091_8864000016_0010029003_07_lamp.docx.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (455kB) | Request a copy

Abstract

PT Ulima Nitra is a mining contractor company working on contracts at PT Mine Muara Enim, Muara Enim Regency, South Sumatra Province. The mining system being worked on is an open pit mining system (surface mining) using the open pit mining method. Slippery is a haul road that is slippery due to rain. Slippery road conditions result in the means of conveyance not being able to operate properly. The conveyance must wait until the slippery activities on the haul road are completed. The long distance of the overburden haul road (1300 meters) makes slippery handling on the overburden haul road quite long, which is 2.49 hours per each slippery handling. Slippery handling activities that take too long will increase the bottleneck time on the conveyance so that production activities will be hampered. Overburden slippery haul road handling activities are carried out using bulldozers and motor graders. Bulldozers dozing the middle of the haul road and clearing puddles. Productivity of the D85ESS Bulldozer is 317.82 m3/hour with a duration of dozing the middle of the haul road for 30.26 minutes. Motor graders maintain the entire haul road area. The productivity of the GD705 motor grader is 21,860.64 m2/hour. The duration of the motor grader to treat the entire haul road area is 70.8 minutes. The duration of sliperry handling activities based on the calculation results is 101.06 minutes and based on the Project Control report is 149.57 minutes. The duration of sliperry handling activities can be reduced from 101.06 minutes to 85.93 minutes with the duration of sliperry being reduced by 15.13 minutes for each sliperry handling. Improvements that can be made to reduce the duration of slipperry by adding 1 unit of D85ESS bulldozer in handling slipperry can reduce the duration of sliperry by 15.13 minutes.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Slippery, Bulldozer, Motor Greader
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Yoland Saputra
Date Deposited: 10 Jul 2023 06:56
Last Modified: 10 Jul 2023 06:56
URI: http://repository.unsri.ac.id/id/eprint/115212

Actions (login required)

View Item View Item