FAHREZI, MUHAMMAD GANDHI and Susanti, Betty (2023) ANALISIS PENGENDALIAN WAKTU DAN BIAYA MENGGUNAKAN METODE FAST TRACK PADA PROYEK PEMBANGUNAN GEDUNG PENGEMBANGAN KARAKTER MAHASISWA UNIVERSITAS SRIWIJAYA. Undergraduate thesis, Sriwijaya University.
Text
RAMA_22201_03011281924079.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (13MB) | Request a copy |
|
Text
RAMA_22201_03011281924079_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (5MB) | Request a copy |
|
Text
RAMA_22201_03011281924079_0004018001_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) |
|
Text
RAMA_22201_03011281924079_0004018001_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (618kB) | Request a copy |
|
Text
RAMA_22201_03011281924079_0004018001_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (298kB) | Request a copy |
|
Text
RAMA_22201_03011281924079_0004018001_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
|
Text
RAMA_22201_03011281924079_0004018001_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (157kB) | Request a copy |
|
Text
RAMA_22201_03011281924079_0004018001_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (390kB) | Request a copy |
|
Text
RAMA_22201_03011281924079_0004018001_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (9MB) | Request a copy |
Abstract
Construction projects in Indonesia are growing rapidly, followed by the level of complexity of their implementation. However, in practice, a project has its own obstacles. Therefore, project management is an important aspect in the implementation of construction projects. Most of the scheduling methods used in project management in Indonesia still use conventional methods, namely the S Curve and Bar Chart, because these two methods are easy to understand and fairly simple and can make it easier to control the duration of the planned project. However, the use of conventional methods has its own risks in supervising ongoing projects. So that an alternative acceleration is needed, namely the Fast Track Method. This research was conducted at the Sriwijaya University Student Character Development Building Project. The project was chosen because of delays and scheduling using conventional methods. Acceleration uses the help of Microsoft Project 2019 to find out the critical path with PDM. The results of the acceleration analysis can reduce the duration by 11.67% or 21 days and cost savings of IDR 143,686,667 or 0.93% from the initial contract.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Fast Track, Network Planning, Precedence Diagram Method |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works |
Divisions: | 03-Faculty of Engineering > 22201-Civil Engineering (S1) |
Depositing User: | Muhammad Gandhi Fahrezi |
Date Deposited: | 12 Jul 2023 02:09 |
Last Modified: | 12 Jul 2023 02:09 |
URI: | http://repository.unsri.ac.id/id/eprint/115881 |
Actions (login required)
View Item |