ANALISA KERJA SAMA OPERASIONAL (JOINT OPERATION) ANTAR KONTRAKTOR PADA PROYEK PEMBANGUNAN BENGKEL OTOMOTIF SMK NEGERI 2 PALEMBANG

DITA, FINI HARNA and Juliantina, Ika (2013) ANALISA KERJA SAMA OPERASIONAL (JOINT OPERATION) ANTAR KONTRAKTOR PADA PROYEK PEMBANGUNAN BENGKEL OTOMOTIF SMK NEGERI 2 PALEMBANG. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03091401039.pdf] Text
RAMA_22201_03091401039.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (54MB) | Request a copy
[thumbnail of RAMA_22201_03091401039_0001076005_01_front_ref.pdf] Text
RAMA_22201_03091401039_0001076005_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (6MB)
[thumbnail of RAMA_22201_03091401039_0001076005_02.pdf] Text
RAMA_22201_03091401039_0001076005_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_22201_03091401039_0001076005_03.pdf] Text
RAMA_22201_03091401039_0001076005_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_22201_03091401039_0001076005_04.pdf] Text
RAMA_22201_03091401039_0001076005_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (20MB) | Request a copy
[thumbnail of RAMA_22201_03091401039_0001076005_05.pdf] Text
RAMA_22201_03091401039_0001076005_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (777kB) | Request a copy
[thumbnail of RAMA_22201_03091401039_0001076005_06_ref.pdf] Text
RAMA_22201_03091401039_0001076005_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (746kB) | Request a copy
[thumbnail of RAMA_22201_03091401039_0001076005_07_lamp.pdf] Text
RAMA_22201_03091401039_0001076005_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (14MB) | Request a copy

Abstract

Jcint Operation is the cooperation between the two companies or more over a particular period and aims to complete a projecl. In the construction seetor, joint operation is a strategic step since it has a variety of benefits, such as incrcasing the ability to compete, by using the power of several companies as well opportunities for compctitors to be partner position, with the result that reduced the number of competitors. Therefore, joint operation is often used as one altemative, especially for contractors in competing in the market of construction Services. In the automotive repair shops construction projcct SMK Negeri 2 Palembang, a joint operation is carried out by three contractors, PT Waskita Karya, PT Menumbing Jaya and PT Detail RancangBangun. needs to be analyzcd about the type anu model of joint operation selected and joint operation to project succcss. The stages of the research were conducted frorn literature studies, collecting the primary and secondary data, proccssing the data by using ratting scale method, and analyzing the data by using validitv and reliability. as merease Based on the analyzing, joint operation which was implemented by the contractor was joint operation integrated manajement tvpe with two-level organizatioaal inodels. Meamvhile, the results of the studv to measure the pcrtormancc of joint operation contractor on tliis project showed that using the method of ratting scale met the very well eriteria which can be evidenced by analysis of validity and reliabilitv. Wherein, the results of questionnaires cn the contractor level and the level of worker was valid with the value of aboveaverage validitas r = 0.3 and exprcssed real, with reliability values above 0.6. By using good joint operation impicmentation of developmcnt projects of automotive repair shops SMK Negen 2 Palembang can be done well.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Joint Operation, Organization, contractor
Subjects: T Technology > TH Building construction > TH1-9745 Building construction
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Mrs Furika Furika
Date Deposited: 27 Jul 2023 04:56
Last Modified: 27 Jul 2023 04:58
URI: http://repository.unsri.ac.id/id/eprint/122162

Actions (login required)

View Item View Item