SIMULASI DAN ANALISIS METODE INTEGRATED PIT STOP UNTUK MEMINIMALISIR ABNORMAL CYCLE MENGGUNAKAN SOFTWARE HAULSIM 3.6 DI PIT MTBU PT PAMAPERSADA NUSANTARA

PRAMESTHIE, ALIEFIA ENDAH PUTRI and Ibrahim, Eddy and Waristian, Harry (2024) SIMULASI DAN ANALISIS METODE INTEGRATED PIT STOP UNTUK MEMINIMALISIR ABNORMAL CYCLE MENGGUNAKAN SOFTWARE HAULSIM 3.6 DI PIT MTBU PT PAMAPERSADA NUSANTARA. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021182025004_TURNITIN.pdf] Text
RAMA_31201_03021182025004_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (15MB) | Request a copy
[thumbnail of RAMA_31201_03021182025004.pdf] Text
RAMA_31201_03021182025004.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (28MB) | Request a copy
[thumbnail of RAMA_31201_03021182025004_0022116203_0014058902_01_front_ref.pdf] Text
RAMA_31201_03021182025004_0022116203_0014058902_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (28MB)
[thumbnail of RAMA_31201_03021182025004_0022116203_0014058902_02.pdf] Text
RAMA_31201_03021182025004_0022116203_0014058902_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (406kB) | Request a copy
[thumbnail of RAMA_31201_03021182025004_0022116203_0014058902_03.pdf] Text
RAMA_31201_03021182025004_0022116203_0014058902_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (412kB) | Request a copy
[thumbnail of RAMA_31201_03021182025004_0022116203_0014058902_04.pdf] Text
RAMA_31201_03021182025004_0022116203_0014058902_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (840kB) | Request a copy
[thumbnail of RAMA_31201_03021182025004_0022116203_0014058902_05.pdf] Text
RAMA_31201_03021182025004_0022116203_0014058902_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (37kB) | Request a copy
[thumbnail of RAMA_31201_03021182025004_0022116203_0014058902_06_ref.pdf] Text
RAMA_31201_03021182025004_0022116203_0014058902_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (90kB) | Request a copy
[thumbnail of RAMA_31201_03021182025004_0022116203_0014058902_07_lamp.pdf] Text
RAMA_31201_03021182025004_0022116203_0014058902_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

Abnormal cycles refer to periods when mining operations are disrupted or temporarily halted for maintenance, refueling, or other time-consuming activities. The integrated pit stop method emerges as a potential solution to address abnormal cycle issues. This study aims to investigate and analyze the integrated pit stop method during rest periods at coal mining sites using the Haulsim 3.6 simulation software. The simulation model depicts the actual conditions of hauler activities in open-pit mines. Based on the simulation results, significant differences are observed between the integrated pit stop and non-integrated pit stop schemes, particularly in cycle time. The integrated pit stop method exhibits a longer average cycle time (20.58 minutes) compared to the non-integrated pit stop (19.10 minutes). The non-integrated pit stop method results in a waste production of 154,631 BCM/day, with coal production of 44,600 tons/day. The average loader utilization is 71-73%, while the hauler utilization averages 84-86%. Conversely, the integrated pit stop method shows a waste production of 163,452 BCM/day, with coal production of 47,776 tons/day. The average loader utilization is 75-78%, while the hauler utilization averages 83-85%.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Abnormal Cycle, Integrated Pit Stop, Refuelling, Haulsim 3.6.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Aliefia Endah Putri Pramesthie
Date Deposited: 22 May 2024 02:57
Last Modified: 22 May 2024 02:57
URI: http://repository.unsri.ac.id/id/eprint/144951

Actions (login required)

View Item View Item