SIMULASI PENAMBAHAN LOKASI CHANGE SHIFT ALAT ANGKUT UNTUK MENINGKATKAN PRODUKTIVITAS ALAT GALI-MUAT MENGGUNAKAN SOFTWARE HAULSIM 3.6 PADA PIT MTBU PT PAMAPERSADA NUSANTARA

RAMYZA, MUHAMMAD and Waristian, Harry and Komar, Syamsul (2024) SIMULASI PENAMBAHAN LOKASI CHANGE SHIFT ALAT ANGKUT UNTUK MENINGKATKAN PRODUKTIVITAS ALAT GALI-MUAT MENGGUNAKAN SOFTWARE HAULSIM 3.6 PADA PIT MTBU PT PAMAPERSADA NUSANTARA. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021182025018.pdf] Text
RAMA_31201_03021182025018.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021182025018_TURNITIN.pdf] Text
RAMA_31201_03021182025018_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_31201_03021182025018_0014058902_9990087012_01_front_ref.pdf] Text
RAMA_31201_03021182025018_0014058902_9990087012_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (470kB)
[thumbnail of RAMA_31201_03021182025018_0014058902_9990087012_02.pdf] Text
RAMA_31201_03021182025018_0014058902_9990087012_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (247kB) | Request a copy
[thumbnail of RAMA_31201_03021182025018_0014058902_9990087012_03.pdf] Text
RAMA_31201_03021182025018_0014058902_9990087012_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (419kB) | Request a copy
[thumbnail of RAMA_31201_03021182025018_0014058902_9990087012_04.pdf] Text
RAMA_31201_03021182025018_0014058902_9990087012_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (763kB) | Request a copy
[thumbnail of RAMA_31201_03021182025018_0014058902_9990087012_05.pdf] Text
RAMA_31201_03021182025018_0014058902_9990087012_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (172kB) | Request a copy
[thumbnail of RAMA_31201_03021182025018_0014058902_9990087012_06_ref.pdf] Text
RAMA_31201_03021182025018_0014058902_9990087012_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (170kB) | Request a copy
[thumbnail of RAMA_31201_03021182025018_0014058902_9990087012_07_lamp.pdf] Text
RAMA_31201_03021182025018_0014058902_9990087012_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (309kB) | Request a copy

Abstract

Optimizing the usage of hauling equiptment is crucial to achieve production targets, one of which is the addition of ideal change shift location. Currently there are three change shift locations positioned 1.500 m to 3.500 m from the mining front, reducing haulers effective time in the field. The purpose of this study is to evaluate the impact of adding change shift locations on productivity using Haulsim 3.6 simulation software. The simulation model depicts the actual conditions of digging-loading and hauling process in an open-pit mine. Based on the results of the simulation, there is an increase in production and productivity between three and five change shift locations, five change shift locations have higher production and productivity than three change shift locations. The results reveal that the addition of change shift locations increased coal output by 1.523,87 Tons/day and waste by 2.756,81 BCM/day. Waste productivity increased by an average of 8.31 BCM/hour and 10,53 tons/hour for coal.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Change Shift, Simulasi, Produksi, Produktivitas
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Muhammad Ramyza
Date Deposited: 25 Sep 2024 02:12
Last Modified: 25 Sep 2024 02:12
URI: http://repository.unsri.ac.id/id/eprint/158044

Actions (login required)

View Item View Item