ESTIMASI PERHITUNGAN BIAYA STRUKTUR BANGUNAN GEDUNG MENGGUNAKAN BUILDING INFORMATION MODELLING (BIM) CUBICOST PADA PROYEK RUMAH SUSUN ASN 2 IKN NUSANTARA

FATHURROHIM, AL ISNA and Susanti, Betty (2025) ESTIMASI PERHITUNGAN BIAYA STRUKTUR BANGUNAN GEDUNG MENGGUNAKAN BUILDING INFORMATION MODELLING (BIM) CUBICOST PADA PROYEK RUMAH SUSUN ASN 2 IKN NUSANTARA. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011282126035_cover.jpg]
Preview
Text
RAMA_22201_03011282126035_cover.jpg - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (437kB) | Preview
[thumbnail of RAMA_22201_03011282126035.pdf] Text
RAMA_22201_03011282126035.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (86MB) | Request a copy
[thumbnail of RAMA_22201_03011282126035_TURNITIN.pdf] Text
RAMA_22201_03011282126035_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (22MB) | Request a copy
[thumbnail of RAMA_22201_03011282126035_0004018001_01_front_ref.pdf] Text
RAMA_22201_03011282126035_0004018001_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (8MB)
[thumbnail of RAMA_22201_03011282126035_0004018001_02.pdf] Text
RAMA_22201_03011282126035_0004018001_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (475kB) | Request a copy
[thumbnail of RAMA_22201_03011282126035_0004018001_03.pdf] Text
RAMA_22201_03011282126035_0004018001_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (578kB) | Request a copy
[thumbnail of RAMA_22201_03011282126035_0004018001_04.pdf] Text
RAMA_22201_03011282126035_0004018001_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_22201_03011282126035_0004018001_05.pdf] Text
RAMA_22201_03011282126035_0004018001_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (186kB) | Request a copy
[thumbnail of RAMA_22201_03011282126035_0004018001_06_ref.pdf] Text
RAMA_22201_03011282126035_0004018001_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (199kB) | Request a copy
[thumbnail of RAMA_22201_03011282126035_0004018001_07_lamp.pdf] Text
RAMA_22201_03011282126035_0004018001_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (67MB) | Request a copy

Abstract

In the current digital era, the construction industry continues to evolve by leveraging information technology to enhance efficiency and productivity. One increasingly popular technology is Building Information Modelling (BIM), which enables more accurate planning and execution of construction projects through simulation and digital model-based analysis. This study examines the application of BIM in calculating structural work volumes using Glodon Cubicost software in the Rumah Susun ASN 2 IKN Nusantara project. The research findings indicate that the use of Cubicost TAS and TRB produces a more detailed Quantity Take-off (QTO) report compared to conventional methods. The cost estimation generated by the BIM Cubicost application shows a total cost of Rp32,627,023,394, while the project's Rencana Anggaran Biaya (RAB) calculation amounts to Rp33,585,945,631, resulting in a cost difference of Rp958,922,237 or 2.85% lower. These findings indicate that the implementation of BIM not only improves the efficiency of volume calculations but also enhances project management effectiveness.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Building Information Modelling, Quantity Take-off, Estimasi Biaya Konstruksi, Efisiensi Proyek, Glodon Cubicost
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Al Isna Fathurrohim
Date Deposited: 18 Mar 2025 05:56
Last Modified: 18 Mar 2025 05:56
URI: http://repository.unsri.ac.id/id/eprint/169242

Actions (login required)

View Item View Item