MAHARANI, ANISSA and Indriyati, Citra (2025) ANALISIS RISIKO PADA PROYEK BENDUNGAN TIGA DIHAJI OGAN KOMERING ULU SELATAN. Undergraduate thesis, Sriwijaya University.
![]() ![]() Preview |
Image
RAMA_22201_03011182126003_cover.jpg - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (994kB) | Preview |
![]() |
Text
RAMA_22201_03011182126003.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (8MB) | Request a copy |
![]() |
Text
RAMA_22201_03011182126003_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (17MB) | Request a copy |
![]() |
Text
RAMA_22201_03011182126003_00114018106_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (2MB) |
![]() |
Text
RAMA_22201_03011182126003_00114018106_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (550kB) | Request a copy |
![]() |
Text
RAMA_22201_03011182126003_00114018106_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (620kB) | Request a copy |
![]() |
Text
RAMA_22201_03011182126003_00114018106_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (885kB) | Request a copy |
![]() |
Text
RAMA_22201_03011182126003_00114018106_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (230kB) | Request a copy |
![]() |
Text
RAMA_22201_03011182126003_00114018106_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (229kB) | Request a copy |
![]() |
Text
RAMA_22201_03011182126003_00114018106_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (3MB) | Request a copy |
Abstract
Dam construction projects have significant risks that can affect technical, labor, and environmental aspects so that effective risk management is needed. This research aims to identify and analyze the risks in excavation and embankment work on the Tiga Dihaji Dam project and determine the appropriate mitigation strategy. The research method uses a quantitative approach through distributing questionnaires to contractors and project consultants. Risk analysis is carried out using the Severity Index to assess the probability and impact of risks which are then mapped in a probability-impact matrix to determine the dominant level of risk. The results showed that the main risks included difficult terrain, bad weather, and work accidents due to the use of heavy equipment. The highest risks occur in the labor aspect, such as being hit by landslide materials and fatigue due to long working hours. Technical risks include project delays due to weather and heavy equipment wear, while environmental risks include soil erosion and air pollution due to construction activities. The results of this study are expected to serve as a reference for similar dam projects in the future in improving the effectiveness of risk management.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Risiko Konstruksi, Proyek Bendungan, Severity index |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works |
Divisions: | 03-Faculty of Engineering > 22201-Civil Engineering (S1) |
Depositing User: | Anissa Maharani |
Date Deposited: | 20 Mar 2025 07:02 |
Last Modified: | 20 Mar 2025 07:02 |
URI: | http://repository.unsri.ac.id/id/eprint/169544 |
Actions (login required)
![]() |
View Item |