MAHARANI, ANGGITA and Susanti, Betty (2025) ANALISIS FAKTOR PENYEBAB CONTRACT CHANGE ORDER PADA PROYEK KONSTRUKSI DI KOTA PALEMBANG. Undergraduate thesis, Sriwijaya University.
![]() ![]() Preview |
Image
RAMA_22201_03011382126120_cover.jpg - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) | Preview |
![]() |
Text
RAMA_22201_03011382126120.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (49MB) | Request a copy |
![]() |
Text
RAMA_22201_03011382126120_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (20MB) | Request a copy |
![]() |
Text
RAMA_22201_03011382126120_0004018001_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (24MB) |
![]() |
Text
RAMA_22201_03011382126120_0004018001_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
![]() |
Text
RAMA_22201_03011382126120_0004018001_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (827kB) | Request a copy |
![]() |
Text
RAMA_22201_03011382126120_0004018001_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
![]() |
Text
RAMA_22201_03011382126120_0004018001_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (312kB) | Request a copy |
![]() |
Text
RAMA_22201_03011382126120_0004018001_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (265kB) | Request a copy |
![]() |
Text
RAMA_22201_03011382126120_0004018001_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (22MB) | Request a copy |
Abstract
Changes in construction projects frequently occur due to various factors, known as Contract Change Order (CCO). This study aims to identify the factors causing CCO in construction projects in Palembang, analyze its impacts, and formulate mitigation strategies to minimize potential risks. A quantitative research approach was used by distributing questionnaires to respondents consisting of project owners and contractors. Data analysis was conducted using the Guttman Scale and Relative Importance Index (RII). The results indicate that the main causes of CCO include design changes, planning errors, site conditions that do not match the initial plans, and administrative constraints. The impacts include project delays, increased costs, and potential conflicts between stakeholders. To mitigate these impacts, this study recommends more thorough planning, improved communication between project owners and contractors, and the implementation of stricter project management systems.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Contract Change Order, proyek konstruksi, faktor penyebab, dampak, strategi mitigasi. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works |
Divisions: | 03-Faculty of Engineering > 22201-Civil Engineering (S1) |
Depositing User: | Anggita Maharani |
Date Deposited: | 16 Apr 2025 01:12 |
Last Modified: | 16 Apr 2025 01:12 |
URI: | http://repository.unsri.ac.id/id/eprint/170306 |
Actions (login required)
![]() |
View Item |