ANALISIS HASIL PEMANTAUAN KESTABILAN LERENG PADA FRONT PENAMBANGAN BATUBARA DENGAN MENGGUNAKAN SLOPE STABILITY RADAR (SSR) VCP 60 DAN VCP 180 DI PIT E BANKO PT SATRIA BAHANA SARANA, TANJUNG ENIM, SUMATERA SELATAN

HANDANI, VERRY AGUSTIAN and Pebrianto, Rosihan and Cahyaningsih, Bimbi (2025) ANALISIS HASIL PEMANTAUAN KESTABILAN LERENG PADA FRONT PENAMBANGAN BATUBARA DENGAN MENGGUNAKAN SLOPE STABILITY RADAR (SSR) VCP 60 DAN VCP 180 DI PIT E BANKO PT SATRIA BAHANA SARANA, TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021382025094_cover.jpg]
Preview
Image
RAMA_31201_03021382025094_cover.jpg - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (286kB) | Preview
[thumbnail of RAMA_31201_03021382025094.pdf] Text
RAMA_31201_03021382025094.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (20MB) | Request a copy
[thumbnail of RAMA_31201_03021382025094_TURNITIN.pdf] Text
RAMA_31201_03021382025094_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (22MB) | Request a copy
[thumbnail of RAMA_31201_03021382025094_0010029003_0205069201_01_front_ref.pdf] Text
RAMA_31201_03021382025094_0010029003_0205069201_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (2MB)
[thumbnail of RAMA_31201_03021382025094_0010029003_0205069201_02.pdf] Text
RAMA_31201_03021382025094_0010029003_0205069201_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021382025094_0010029003_0205069201_03.pdf] Text
RAMA_31201_03021382025094_0010029003_0205069201_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021382025094_0010029003_0205069201_04.pdf] Text
RAMA_31201_03021382025094_0010029003_0205069201_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021382025094_0010029003_0205069201_05.pdf] Text
RAMA_31201_03021382025094_0010029003_0205069201_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (150kB) | Request a copy
[thumbnail of RAMA_31201_03021382025094_0010029003_0205069201_06_ref.pdf] Text
RAMA_31201_03021382025094_0010029003_0205069201_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (133kB) | Request a copy
[thumbnail of RAMA_31201_03021382025094_0010029003_0205069201_07_lamp.pdf] Text
RAMA_31201_03021382025094_0010029003_0205069201_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy

Abstract

Mine slope monitoring techniques have significantly evolved along with technological advances. Slope Stability radar (SSR) is a slope monitoring tools that has the advantage of monitoring slope conditions in real time with a wide range. Data collection was carried out at PT Satria Bahana Sarana in the South Banko PIT E area (which has experienced a landslide) with pixel coordinates SSR x = 212 and y = 14 in June 2024. During the observation, the dominant showed linear deformation behavior, there was some regressive deformation behavior and there was one progressive behavior that caused a landslide on June 23 at 13:38. Landslides can be predicted using the inverse velocity method assisted by using two software, namely IQ Monitor and Microsoft Excel, when using IQ Monitor with a velocity calculation periods (VCP) reading of 60 predicting the time of landslide on June 23 at 14:16 and for a velocity calculation periods (VCP) reading of 180 predicting the time of landslide on June 23 at 13:45, This means that there is a difference of 07 minutes slower than the actual time and the VCP 180 reading is more effective because the prediction time value is closer to the actual time of the landslide compared to the VCP 60 reading and if using Microsoft Excel with a velocity calculation periods (VCP) reading of 180, the landslide time prediction will occur on June 23 at 14:24 and for the reading (VCP) 60 the landslide time prediction will occur on June 23 at 13:48, This means that there is a difference of 10 minutes slower than the actual time and in Microsoft Excel the VCP 60 reading is more effective to use than the VCP 180 reading. The recommendation of a velocity calculation periods (VCP) reading of 60 is better used in Microsoft Excel software and a velocity calculation periods (VCP) reading of 180 is better used in Monitor IQ software.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Lereng, Slope Stability Radar (SSR), Deformasi, Inverse Velocity
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Verry Agustian Handani
Date Deposited: 19 May 2025 04:06
Last Modified: 19 May 2025 04:06
URI: http://repository.unsri.ac.id/id/eprint/172893

Actions (login required)

View Item View Item