GERTY, M. ASADEL and Herlina, Herlina (2025) EVALUASI KOORDINASI KINERJA SISTEM PROTEKSI RELAY OVERLOAD SHEDDING PADA TRANSFORMATOR DAN RELAY OVERCURRENT PADA PENYULANG DI JALUR DISTRIBUSI DI GARDU INDUK BUKIT SIGUNTANG. Undergraduate thesis, Sriwijaya University.
![]() ![]() Preview |
Image
RAMA_20201_03041182126002_COVER.jpg - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) | Preview |
![]() |
Text
RAMA_20201_03041182126002.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (7MB) | Request a copy |
![]() |
Text
RAMA_20201_03041182126002_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (10MB) | Request a copy |
![]() |
Text
RAMA_20201_03041182126002_0007078005_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (2MB) |
![]() |
Text
RAMA_20201_03041182126002_0007078005_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (640kB) | Request a copy |
![]() |
Text
RAMA_20201_03041182126002_0007078005_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (305kB) | Request a copy |
![]() |
Text
RAMA_20201_03041182126002_0007078005_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
![]() |
Text
RAMA_20201_03041182126002_0007078005_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (312kB) | Request a copy |
![]() |
Text
RAMA_20201_03041182126002_0007078005_06_ref.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (210kB) | Request a copy |
![]() |
Text
RAMA_20201_03041182126002_0007078005_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (3MB) | Request a copy |
Abstract
In the power system Bukit Siguntang Substation, specifically on Power transformer#2 use two type of relay that are overload shedding relays (OLS) and overcurrent relays (OCR). Therefore, a study was conducted to evaluate the protection relay settings for OLS and OCR with the objective of optimizing power distribution using the N-1 Contingency Method. Based on calculation results, the single-phase short-circuit current was found to be 274.26 A, the two-phase short circuit current was 3,221.96 A, and the three-phase short-circuit current was 3,593.47 A. Simulation results using ETAP 19.0.1 with a contingency scenario involving the outage of the Bukit Siguntang Substation transformer showed that the system did not experience overload conditions due to the disturbance. However, the system did exhibit changes in phase angle and a voltage drop. This indicates that although the system continued to operate, it cannot function properly without the transformer. The transformer plays a critical role not only as a power supply source but also in maintaining system balance and regulating voltage within the network.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Distribution System, Relay OCR, Relay OLS, Contingency |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK3001-3521 Distribution or transmission of electric power |
Divisions: | 03-Faculty of Engineering > 20201-Electrical Engineering (S1) |
Depositing User: | M. Asadel Gerty |
Date Deposited: | 20 Jun 2025 07:45 |
Last Modified: | 20 Jun 2025 07:45 |
URI: | http://repository.unsri.ac.id/id/eprint/175832 |
Actions (login required)
![]() |
View Item |